01.02.2015 Views

2010 Full Year Results Presentation - Antofagasta plc

2010 Full Year Results Presentation - Antofagasta plc

2010 Full Year Results Presentation - Antofagasta plc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Transport and Water businesses<br />

Chile´s <strong>Antofagasta</strong> Region<br />

Mejillones<br />

<strong>Antofagasta</strong><br />

Tocopilla<br />

Michilla<br />

Interacid<br />

Terminal<br />

Chuquicamata<br />

Sierra<br />

Gorda<br />

Alto Norte<br />

Augusta<br />

Victoria<br />

El Abra<br />

Lomas Bayas<br />

El Salvador<br />

Calama<br />

El Tesoro<br />

Esperanza<br />

Gaby<br />

Zaldivar<br />

Escondida<br />

Conchi<br />

Transport <strong>2010</strong><br />

• Combined rail and road volumes of 8.1 million<br />

tons (rail volumes of 6.2 million tons and road<br />

volumes of 1.9 million tons)<br />

• Total revenues US$155 million (*)<br />

• EBITDA US$60 million<br />

Water <strong>2010</strong><br />

• Water volume of 46.3 million m3<br />

• Revenues US$92 million (**)<br />

• EBITDA US$67 million<br />

Rail Network<br />

Rail station<br />

Owned Mine<br />

Mine<br />

City / port<br />

(*) Represents third party revenues, stated after eliminating sales to <strong>Antofagasta</strong>’s mining division of US$10.3m<br />

(**) Represents third party revenues, stated after eliminating sales to <strong>Antofagasta</strong>’s mining division of US$8.6m<br />

43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!