06.02.2015 Views

Status of GPS networks in Bosnia and Herzegovina - BALGEOS

Status of GPS networks in Bosnia and Herzegovina - BALGEOS

Status of GPS networks in Bosnia and Herzegovina - BALGEOS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Patriotske lige 30, Tel.++387 33 27 84 00; Fax.++387 33 20 01 58; E-mail: gfsa@gf.unsa.ba http://www.gf.unsa.ba<br />

<strong>Status</strong> <strong>of</strong> <strong>GPS</strong> <strong>networks</strong> <strong>in</strong><br />

<strong>Bosnia</strong> <strong>and</strong> Herzegov<strong>in</strong>a<br />

Medžida Mulić<br />

Civil Eng<strong>in</strong>eer<strong>in</strong>g Faculty Sarajevo<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

1


Content<br />

• Civil Eng<strong>in</strong>eer<strong>in</strong>g Faculty Sarajevo<br />

• Department <strong>of</strong> Geodesy<br />

• BH team <strong>in</strong> BalGeos<br />

• <strong>GPS</strong> Activities <strong>in</strong> BiH<br />

• BIHPOS<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

2


E-mail:<br />

gfsa@gf.unsa.ba<br />

htpp://www.gf.unsa.ba<br />

Faculty <strong>of</strong> Civil Eng<strong>in</strong>eer<strong>in</strong>g<br />

There are<br />

80 full-time <strong>and</strong><br />

50 part-time employees<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

3


Civil Eng<strong>in</strong>eer<strong>in</strong>g Faculty<br />

<strong>of</strong> the University <strong>in</strong> Sarajevo<br />

E-mail:<br />

gfsa@gf.unsa.ba<br />

htpp://www.gf.unsa.ba<br />

• higher-education education <strong>in</strong>stitution that has existed <strong>in</strong><br />

cont<strong>in</strong>uity s<strong>in</strong>ce 1949. S<strong>in</strong>ce that 4000 students<br />

get diplomas.<br />

• Besides its fundamental role <strong>in</strong> the education <strong>of</strong><br />

future eng<strong>in</strong>eers the faculty also engages <strong>in</strong> the<br />

scientific-research field, <strong>and</strong> has the expertise to<br />

carry out projects <strong>in</strong> the dem<strong>and</strong><strong>in</strong>g fields <strong>of</strong> civil<br />

eng<strong>in</strong>eer<strong>in</strong>g <strong>and</strong> geodesy.<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

4


Civil Eng<strong>in</strong>eer<strong>in</strong>g Faculty<br />

<strong>of</strong> the University <strong>in</strong> Sarajevo<br />

E-mail: gfsa@gf.unsa.ba<br />

htpp://www.gf.unsa.ba<br />

• Organised <strong>in</strong> Departments:<br />

– DEPARTMENT FOR STRUCTURES AND MATERIALS<br />

– DEPARTMENT FOR GEODESY<br />

– DEPARTMENT FOR TRANSPORTATION ENGINEERING<br />

– DEPARTMENT FOR WATER RESOURCES<br />

ENGINEERING<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

5


Civil Eng<strong>in</strong>eer<strong>in</strong>g Faculty<br />

In frame <strong>of</strong> the Department folow<strong>in</strong>g Institutes exsist:<br />

• INSTITUTE FOR STRUCTURES AND MATERIALS<br />

• INSTITUTE FOR GEOLOGY AND GEOTECHNICAL<br />

ENGINEERING<br />

• INSTITUTE FOR GEODESY AND GEOINFORMATICS<br />

ICS<br />

• INSTITUTE FOR TRANSPORTATION ENGINEERING<br />

• INSTITUTE FOR WATER RESOURCES ENGINEERING<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

6


Demage <strong>of</strong> the Faculty build<strong>in</strong>g<br />

on the <strong>and</strong> <strong>of</strong> the agression 1995<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

7


Department <strong>of</strong> Geodesy<br />

• Established <strong>in</strong> the year 1973<br />

• More than 400 students get title Dipl.Ing.<br />

<strong>of</strong> Geodesy<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

8


Department <strong>of</strong> Geodesy<br />

• For the precise geodetic jobs Department has at<br />

disposal:<br />

• five complite sets <strong>of</strong> <strong>GPS</strong> receivers (Tremble(<br />

4000SSI), three fully-equipped total stations (TC<br />

1800, LEICA 2002)<br />

• digital surveyor’s s level<strong>in</strong>g <strong>in</strong>strument,<br />

• A lot <strong>of</strong> traditional geodetic<br />

equipment.<br />

• licenses to use the follow<strong>in</strong>g s<strong>of</strong>tware<br />

applications: TOPOCAD, SCOPE, LeicaL<br />

SKI Pro<br />

<strong>GPS</strong>, Leica GEO OFFICE, AutoCAD, ARC<br />

VIEW, ARC INFO<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

9


BiH team <strong>in</strong> BalGEOS<br />

Team lider:<br />

Pr<strong>of</strong>. Dr. Ing. Asim Bilajbegović<br />

Dipl.Ing. Nedim Tuno<br />

Mr.Sci.Ing. Omićevi<br />

ević Džan<strong>in</strong>a<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

10


BiH team <strong>in</strong> BalGEO Project<br />

Mr.Sci.Ing. Medžida Mulić<br />

Mr.Sci.Ing. Jasm<strong>in</strong>Taletović<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

11


<strong>GPS</strong> Activities <strong>in</strong> BiH<br />

• EUREF <strong>GPS</strong> campa<strong>in</strong>ge1998<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

12


BIHREF 2000<br />

REPUBLIKA HRVATSKA<br />

Novoselsko brdo<br />

Kudić brdo<br />

235<br />

Lis<strong>in</strong>a<br />

240<br />

REPUBLIKA HRVATSKA<br />

Stražište<br />

237<br />

Osječenica<br />

275<br />

Livanjsko polje<br />

436 II<br />

Kozara<br />

Šumatica<br />

238 Bubanj<br />

393 Turić<br />

106<br />

394<br />

Kabajkovac<br />

Okresanica<br />

243 V. ostrovica 260 Lazarevica<br />

Tisovac novi 399<br />

3<br />

309<br />

Stolice<br />

Ranča<br />

377<br />

369 Tvrtkovac<br />

Vlašić<br />

262 V. bratilo<br />

3 Igrište<br />

Dekala<br />

258<br />

370<br />

48<br />

BOSNA I HERCEGOVINA<br />

Čubren<br />

Sarajevo GF<br />

Raduša<br />

40 SRJV<br />

371<br />

Bjelašnica<br />

Čvrsnica<br />

Borovac<br />

Midena 268<br />

280<br />

47/273<br />

358 Borašnica<br />

331<br />

Maglić 72/276<br />

Buturovica Banja glava<br />

218 1045 Ponikve<br />

Alad<strong>in</strong>sko brdo1074<br />

Obljaj<br />

526<br />

LEGENDA:<br />

Tačke <strong>GPS</strong> kampanje EUREF 98<br />

Referentne <strong>GPS</strong> tačke<br />

SR JUGOSLAVIJA<br />

Novoodređene <strong>GPS</strong> tačke<br />

Leotar<br />

90/318<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

13


Geodynamics<br />

• 1998 EXSAGET <strong>GPS</strong> campa<strong>in</strong>ge<br />

• s<strong>in</strong>ce 1999 CERGOP project<br />

• CEGRN 99<br />

• CEGRN 2001<br />

• CEGRN 2003<br />

• CEGRN 2005<br />

• CEGRN 2007<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

14


CERGOP 2/Environment<br />

CEGRN 03 <strong>GPS</strong> campaigne<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

15


CEGRN 05<br />

14 stations re-observed<br />

-Trimble 4000SSi<br />

-Antenna L1/L2 wGP<br />

-55 sessions for 24 h<br />

-Elevation mask 5 °<br />

-<strong>in</strong>vestigation <strong>of</strong> multipath<br />

efects<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

16


CEGRN 05<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

17


CEGRN 07<br />

• Sarajevo<br />

• Kudić brdo<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

18


EPN<br />

• SRJV s<strong>in</strong>ce 1999<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

19


PERMANENT STATION MOSTAR<br />

“MOST”<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

20


BIHPOS<br />

Bosna I Hercegov<strong>in</strong>a`s POsition<strong>in</strong>g System<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

21


“CIPS” telecomunications<br />

<strong>in</strong>frastructure<br />

• For the successful implementation <strong>of</strong><br />

the Project BIHPOS<br />

the telecommunication network is<br />

available<br />

<strong>and</strong> ready to give reliable, redundant<br />

<strong>and</strong> high quality service.<br />

available (<strong>in</strong> the ftrame <strong>of</strong> M<strong>in</strong>istry <strong>of</strong> Civil Affairs <strong>of</strong> BiH)<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

22


Configuration <strong>of</strong> the future<br />

central station<strong>of</strong> BIHPOS <strong>in</strong><br />

Sarajevo<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

23


What has been implemented<br />

• The reconnaissance for the future permanent<br />

GNSS stations <strong>in</strong> 2005:<br />

• Banja Luka, Doboj, Jajce, , Tuzla, Zenica,<br />

Jablanica, Livno.<br />

• Mostar <strong>and</strong> Sarajevo should be BIHPOS station<br />

as well.<br />

• Sarajevo station, perhaps will be re-established<br />

established<br />

at some better location <strong>in</strong> Sarajevo.<br />

• When it happen, the both stations observation<br />

will be observ<strong>in</strong>g for necessary period <strong>of</strong> time,<br />

six month or longer.<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

24


Multipath effects <strong>in</strong>vestigations<br />

for the BIHPOS stations<br />

• The multipath effects <strong>in</strong>vestigted on the <strong>GPS</strong><br />

observations <strong>and</strong> the result<strong>in</strong>g coord<strong>in</strong>ates for<br />

the stations CEGRN 05<br />

• S<strong>of</strong>twere Was<strong>of</strong>t was used<br />

• the conclusion: po<strong>in</strong>ts with strong multipath<br />

effect detected by this s<strong>of</strong>tware, were<br />

problematic po<strong>in</strong>t dur<strong>in</strong>g process<strong>in</strong>g CEGRN05<br />

campaign: Alad<strong>in</strong>ića Brdo, Čvrsnica<br />

<strong>and</strong><br />

Bjelašnica<br />

nica.<br />

• results published on the EGU 2006 symposium<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

25


Tectonic map <strong>and</strong> seismic<br />

activity <strong>of</strong> BiH<br />

(Hrvatović, , H. &Papeš, , J., 2005).<br />

13<br />

45 O 2<br />

12<br />

44<br />

8<br />

7 M-6,4; 3 6<br />

45<br />

date:<br />

25<br />

27.10.1969<br />

N<br />

18 1 6<br />

46<br />

48<br />

C<br />

15<br />

5<br />

24<br />

4<br />

49 SZ-1<br />

E<br />

14<br />

W<br />

51<br />

25 10<br />

7<br />

53<br />

A<br />

25<br />

10<br />

11<br />

5<br />

52<br />

18<br />

9<br />

57<br />

47<br />

56 55<br />

10 43<br />

41<br />

16<br />

19<br />

42<br />

5<br />

39<br />

O<br />

44<br />

18<br />

40<br />

TECTONIC MAP AND SEISMIC ACTIVITY 23 22<br />

20<br />

OF THE BOSNIA AND HERZEGOVINA<br />

10 20<br />

37<br />

Legende<br />

33 30 33 10 First (large) nappes<br />

37<br />

Second order thrusts<br />

19<br />

SZ-3<br />

19<br />

Deep faults<br />

5<br />

M-5,0; h-10 km<br />

35 36<br />

datum/date: 25.08.1970<br />

15 6<br />

N<br />

Normal faults<br />

25 14<br />

E<br />

Strike-slip faults<br />

10 W<br />

10<br />

C<br />

32<br />

15 26<br />

A<br />

9<br />

Earthquake epicentres; magnitude <strong>and</strong> depth <strong>of</strong> focus <strong>in</strong> km<br />

S<br />

O<br />

14<br />

43<br />

10 5-5,5<br />

33 20<br />

17<br />

11 5,6-6<br />

28 20<br />

SZ-4<br />

SZ-5 29<br />

19 6.1-6,7<br />

10<br />

M<strong>in</strong><br />

17<br />

21<br />

24<br />

27<br />

31<br />

33<br />

30<br />

34<br />

38<br />

54<br />

SZ-2<br />

SZ-1 Seismogene<br />

zones<br />

1 Seismogene<br />

structures<br />

Max<br />

Mehanism <strong>of</strong><br />

movement by<br />

earthquakes<br />

Stres regimes<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

26


Thank your !<br />

BalGeo kick-<strong>of</strong>f meet<strong>in</strong>g, Vienna<br />

July 7-9, 2008<br />

27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!