Program Update<br />
<strong>Coastal</strong> <strong>Protection</strong> <strong>and</strong><br />
<strong>Restoration</strong> <strong>Authority</strong> of Louisiana<br />
PARISH PROJECT STATUS SUMMARY<br />
Grant<br />
Application<br />
Grants<br />
Awarded<br />
Project<br />
Design<br />
Project<br />
Assumption<br />
Attakapas Canal Hydrologic <strong>Restoration</strong><br />
Lake Verret Swamp <strong>and</strong> Lake Rim <strong>Restoration</strong><br />
Calcasieu<br />
Clear Marais Bank <strong>Protection</strong><br />
Horseshoe Lake Marsh <strong>Restoration</strong><br />
Rabbit Isl<strong>and</strong><br />
Shoreline <strong>Protection</strong> at Intracoastal Park<br />
South GIWW <strong>Restoration</strong><br />
Cameron<br />
Trosclair Road Repairs Completed July 2009<br />
Little Chenier Road Completed January 2010<br />
Bank Stabilization from Dugas Cut to Kelso Bayou Completed July 2010<br />
West Big Burn Bridge <strong>Restoration</strong> Completed July 2010<br />
East Little Pecan Bayou <strong>Restoration</strong> Completed July 2010<br />
North Mermentau <strong>Restoration</strong> Completed September 2011<br />
South Little Pecan Bayou <strong>Restoration</strong><br />
Dreary Isl<strong>and</strong><br />
South Johnson Bayou<br />
Iberia<br />
Acadiana Regional Airport Improvements – Admiral Doyle<br />
Lake S<strong>and</strong> Terracing<br />
Lake Tom Terracing<br />
Port of Iberia Bridge Replacement – David Duboin Rd<br />
Port of Iberia Bridge – Port Rd.Over Commercial Canal<br />
Port of Iberia Bridge Replacement – Port Rd over Rodere<br />
Vermilion Bay Shoreline <strong>Restoration</strong><br />
Weeks Bay/Commercial Canal Feasibility Study<br />
Jefferson<br />
Bayside Segmented Breakwaters at Gr<strong>and</strong> Isle<br />
Fifi Isl<strong>and</strong> <strong>Restoration</strong> Extension<br />
Goose Bayou Ridge Creation <strong>and</strong> Shoreline <strong>Protection</strong> Completed September 2011<br />
Lower Lafitte Shoreline Stabilization at Bayou Rigolettes<br />
Lafourche<br />
Maritime Forest Ridge <strong>Restoration</strong><br />
Under<br />
Construction<br />
N/A<br />
Northwest Little Lake Marsh Creation <strong>and</strong> Enhancement Completed <strong>April</strong> 2011<br />
Small Dredge Program Completed September 2010<br />
Livingston<br />
Bald Cypress/Tupelo <strong>Coastal</strong> Forest <strong>Protection</strong> Completed May 2011<br />
Hydrologic <strong>Restoration</strong> in Swamps West Lake Maurepas<br />
Livingston Parish Debris Recovery Vessel<br />
Plaquemines<br />
Fringe Marsh Repair<br />
Jump Basin Dredging <strong>and</strong> Marsh Creation<br />
Tidewater Road Flood <strong>Protection</strong> Completed November 2010<br />
Update of the Plaquemines <strong>Coastal</strong> Management Plan<br />
N/A<br />
St. Bernard<br />
Lake Lery Rim Reestablishment <strong>and</strong> Marsh Creation<br />
Update of the St. Bernard <strong>Coastal</strong> Management Plan<br />
N/A<br />
N/A<br />
Grant<br />
Application<br />
Grants<br />
Awarded<br />
Project<br />
Design<br />
Project<br />
St. Charles<br />
East LaBranche Shoreline <strong>Protection</strong><br />
West LaBranche Shoreline <strong>Protection</strong><br />
St. James<br />
Wetl<strong>and</strong> Wastewater Assimilation Process Planning Completed March 2009<br />
Waterline Booster Pump Station, West Bank Completed February 2010<br />
West Bank Wetl<strong>and</strong> Conservation <strong>and</strong> <strong>Protection</strong> Completed <strong>April</strong> 2010<br />
Baytree Freshwater Diversion Property Purchase<br />
East Bank Wastewater Assimilation Plant<br />
Blind River Freshwater Diversion Property Purchase<br />
West Bank Wastewater Assimilation Plant<br />
Waterline Booster Pump Station, East Bank Completed September 2011<br />
St. John the Baptist<br />
West Lac Des Allem<strong>and</strong>s Shoreline <strong>Protection</strong><br />
Reserve Relief Canal Shoreline <strong>Protection</strong><br />
St. Martin<br />
Bayou Amy Trail <strong>and</strong> Educational Pavilion<br />
Beau Bayou Swamp Hydrologic <strong>Restoration</strong><br />
Stephensville Sanitation System/Wastewater Assimilation<br />
St. Mary<br />
Burns Point Recreation Park Improvements Completed January 2011<br />
Deer Isl<strong>and</strong> Pass Realignment<br />
Morgan City Industrial Road<br />
Planning Assistance <strong>and</strong> Administration<br />
Point Chevreuil Shoreline <strong>Protection</strong><br />
Thorguson Road Improvements<br />
St. Tammany<br />
French Property Preservation Project Completed October 2009<br />
M<strong>and</strong>eville Aquatic Ecosystem <strong>Restoration</strong> Project Completed July 2010<br />
Green Property Preservation Project Completed August 2011<br />
Northshore Beach Marsh Creation/<strong>Restoration</strong><br />
Tangipahoa<br />
Lake Pontchartrain Shoreline <strong>Protection</strong><br />
Terrebonne<br />
Falgout Canal Freshwater Enhancement<br />
Vermilion<br />
Henry Hub Access – Charlie Field Rd. Bridge Completed <strong>April</strong> 2011<br />
Henry Hub Access – Charlie Field Road Improvements Completed February <strong>2012</strong><br />
Henry Hub Access Improvements – LA 331 Realignment<br />
Intracoastal City Street Improvements Completed November 2011<br />
North Prong Schooner Bayou Completed November 2010<br />
Oyster Reef Parallel to the Coastline at Chenier au Tigre<br />
Shoreline <strong>Protection</strong> <strong>and</strong> Marsh Creation at Tiger Point<br />
Shoreline <strong>Protection</strong> on SW Point at Southwest Pass<br />
Vermilion CIAP Planning Assistance <strong>and</strong> Administration<br />
Weeks Bay/Commercial Canal Feasibility Study<br />
Under<br />
Construction<br />
N/A<br />
N/A<br />
N/A<br />
N/A<br />
N/A<br />
Robert Routon<br />
CIAP Program<br />
Manager<br />
robert.routon@la.gov<br />
Chuck Perrodin<br />
Public Information<br />
Director<br />
chuck.perrodin2@la.gov<br />
David Williams<br />
Lead Program<br />
Manager<br />
david.williams@la.gov<br />
CIAP Contacts<br />
Travis Woodard<br />
CIAP Management<br />
Team<br />
travis.woodard@la.gov<br />
Brett Young<br />
CIAP Management<br />
Team<br />
brett.young@la.gov<br />
Michael Somme<br />
CIAP Management<br />
Team<br />
michael.somme@la.gov<br />
Joyce Johnson<br />
Chief of Policy<br />
Programs<br />
Joyce_Johnson@fws.gov<br />
CIAP Links<br />
www.lacpra.org www.dnr.louisiana.gov www.dotd.state.la.us www.fws.gov www.csrsonline.com<br />
This Program Update is funded in part with qualified outer continental shelf oil <strong>and</strong> gas revenues by the <strong>Coastal</strong> Impact Assistance Program, Bureau of Ocean Energy Management, Regulation, <strong>and</strong> Enforcement, U.S. Department of the Interior. The views <strong>and</strong> conclusions<br />
contained in this document are those of the authors <strong>and</strong> should not be interpreted as representing the opinions or policies of the U.S. Government. Mention of trade names or commercial products does not constitute their endorsement by the U.S. Government.