<strong>April</strong> <strong>2012</strong><br />

Program Update<br />

<strong>Coastal</strong> <strong>Protection</strong> <strong>and</strong><br />

<strong>Restoration</strong> <strong>Authority</strong> of Louisiana<br />

Projects Underway<br />

or Completed<br />

Funds Awarded<br />

Program Duration<br />

(Months)<br />

CIAP STATUS UPDATE<br />

0<br />

0<br />

0<br />

Louisiana continues to make progress towards the completion of all of the<br />

projects in its <strong>Coastal</strong> Impact Assistance Program which will provide almost<br />

$496M to mitigate the impact of OCS activities.<br />

93 of 99 Projects (94%) are<br />

Complete or Underway<br />

Complete<br />

56%<br />

Under Construction<br />

As of March 30, <strong>2012</strong>; Louisiana <strong>and</strong> its <strong>Coastal</strong> Parishes will have received grant<br />

awards for $245M for the full or partial funding of 82 CIAP Projects <strong>and</strong> have<br />

also submitted gra.nts for an additional $146M which will fully or partially fund 30<br />

additional CIAP Projects.<br />

Louisiana Has Received<br />

Funding for 82 (83%) CIAP Projects<br />

9% 8%<br />

33%<br />

49%<br />

47%<br />

6%<br />

8%<br />

30%<br />

Under Design<br />

Inactive/Not Started<br />

50%<br />

94%<br />

99<br />

$496M<br />

108<br />

State Project Status Summary<br />

Construction Projects<br />

Project Planning Grant Design Construction<br />

Completed<br />

Completed<br />

Completed<br />

Completed<br />

Completed<br />

Lake Salvador Shoreline<br />

<strong>Protection</strong> (Phase III)<br />

Rockefeller Refuge Shoreline<br />

<strong>Protection</strong> Demonstration<br />

CIAP - LA 1<br />

Fourchon to Leeville<br />

Gr<strong>and</strong> Lake<br />

Shoreline <strong>Protection</strong><br />

Barataria L<strong>and</strong> Bridge<br />

Dedicated Dredging<br />

Gulf Intracoastal Waterway<br />

(GIWW) Bank <strong>Restoration</strong><br />

East Gr<strong>and</strong> Terre<br />

Marsh Creation via Beneficial<br />

Use – Marcantel<br />

Orleans L<strong>and</strong> Bridge<br />

Shoreline <strong>Protection</strong><br />

Central Wetl<strong>and</strong>s<br />

Assimilation<br />

Bayou Lamoque<br />

Floodgate Removal<br />

Freshwater Bayou<br />

Bank Stabilization<br />

Caminada Headl<strong>and</strong>s<br />

Completed<br />

Completed<br />

Completed<br />

MS River Long Distance<br />

Sediment Pipeline<br />

Shoreline <strong>Protection</strong><br />

Emergency <strong>Restoration</strong><br />

MS River Freshwater<br />

Introduction to Bayou Lafourche<br />

Living Shoreline <strong>Protection</strong><br />

Demonstration<br />

Non-Construction Projects<br />

Project Planning Grant Status<br />

Blind River<br />

Freshwater Diversion<br />

<strong>Coastal</strong> Forest<br />

Conservation Initiative<br />

MS River Delta Management<br />

Strategic Planning<br />

Performance Evaluation <strong>and</strong><br />

Science Monitoring<br />

Violet Diversion<br />

Not Applicable<br />

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *<br />

Fully Funded Projects<br />

Partially Funded Projects<br />

Projects with Grant Pending<br />

Grant App. Not Submitted for Projects<br />

LA CIAP PLAN AMENDMENT<br />

The Amendments to the Louisiana CIAP Plan submitted to FWS were<br />

approved on March 1, <strong>2012</strong>. The Approved State CIAP Plan <strong>and</strong><br />

Appendices have been posted on the CPRA website at www.lacpra.org.<br />

Questions regarding CIAP can be submitted via email to CIAP@LA.Gov.<br />

*POTENTIAL CIAP FUNDING REDUCTION*<br />

The President’s Fiscal Year 2013 Budget Proposal includes a<br />

$200M reduction to the unobligated CIAP funds of the eligible<br />

States <strong>and</strong> their <strong>Coastal</strong> Political Subdivisions. If this reduction<br />

is passed, then all un-awarded CIAP funds would be at risk of<br />

being reduced or lost. In order to prevent a potential reduction<br />

or loss All Parishes are strongly urged to submit grant<br />

applications <strong>and</strong> amendments for all projects with a<br />

balance of un-awarded CIAP funds ASAP!!


<strong>April</strong> <strong>2012</strong><br />

Program Update<br />

<strong>Coastal</strong> <strong>Protection</strong> <strong>and</strong><br />

<strong>Restoration</strong> <strong>Authority</strong> of Louisiana<br />

PARISH PROJECT STATUS SUMMARY<br />

Grant<br />

Application<br />

Grants<br />

Awarded<br />

Project<br />

Design<br />

Project<br />

Assumption<br />

Attakapas Canal Hydrologic <strong>Restoration</strong><br />

Lake Verret Swamp <strong>and</strong> Lake Rim <strong>Restoration</strong><br />

Calcasieu<br />

Clear Marais Bank <strong>Protection</strong><br />

Horseshoe Lake Marsh <strong>Restoration</strong><br />

Rabbit Isl<strong>and</strong><br />

Shoreline <strong>Protection</strong> at Intracoastal Park<br />

South GIWW <strong>Restoration</strong><br />

Cameron<br />

Trosclair Road Repairs Completed July 2009<br />

Little Chenier Road Completed January 2010<br />

Bank Stabilization from Dugas Cut to Kelso Bayou Completed July 2010<br />

West Big Burn Bridge <strong>Restoration</strong> Completed July 2010<br />

East Little Pecan Bayou <strong>Restoration</strong> Completed July 2010<br />

North Mermentau <strong>Restoration</strong> Completed September 2011<br />

South Little Pecan Bayou <strong>Restoration</strong><br />

Dreary Isl<strong>and</strong><br />

South Johnson Bayou<br />

Iberia<br />

Acadiana Regional Airport Improvements – Admiral Doyle<br />

Lake S<strong>and</strong> Terracing<br />

Lake Tom Terracing<br />

Port of Iberia Bridge Replacement – David Duboin Rd<br />

Port of Iberia Bridge – Port Rd.Over Commercial Canal<br />

Port of Iberia Bridge Replacement – Port Rd over Rodere<br />

Vermilion Bay Shoreline <strong>Restoration</strong><br />

Weeks Bay/Commercial Canal Feasibility Study<br />

Jefferson<br />

Bayside Segmented Breakwaters at Gr<strong>and</strong> Isle<br />

Fifi Isl<strong>and</strong> <strong>Restoration</strong> Extension<br />

Goose Bayou Ridge Creation <strong>and</strong> Shoreline <strong>Protection</strong> Completed September 2011<br />

Lower Lafitte Shoreline Stabilization at Bayou Rigolettes<br />

Lafourche<br />

Maritime Forest Ridge <strong>Restoration</strong><br />

Under<br />

Construction<br />

N/A<br />

Northwest Little Lake Marsh Creation <strong>and</strong> Enhancement Completed <strong>April</strong> 2011<br />

Small Dredge Program Completed September 2010<br />

Livingston<br />

Bald Cypress/Tupelo <strong>Coastal</strong> Forest <strong>Protection</strong> Completed May 2011<br />

Hydrologic <strong>Restoration</strong> in Swamps West Lake Maurepas<br />

Livingston Parish Debris Recovery Vessel<br />

Plaquemines<br />

Fringe Marsh Repair<br />

Jump Basin Dredging <strong>and</strong> Marsh Creation<br />

Tidewater Road Flood <strong>Protection</strong> Completed November 2010<br />

Update of the Plaquemines <strong>Coastal</strong> Management Plan<br />

N/A<br />

St. Bernard<br />

Lake Lery Rim Reestablishment <strong>and</strong> Marsh Creation<br />

Update of the St. Bernard <strong>Coastal</strong> Management Plan<br />

N/A<br />

N/A<br />

Grant<br />

Application<br />

Grants<br />

Awarded<br />

Project<br />

Design<br />

Project<br />

St. Charles<br />

East LaBranche Shoreline <strong>Protection</strong><br />

West LaBranche Shoreline <strong>Protection</strong><br />

St. James<br />

Wetl<strong>and</strong> Wastewater Assimilation Process Planning Completed March 2009<br />

Waterline Booster Pump Station, West Bank Completed February 2010<br />

West Bank Wetl<strong>and</strong> Conservation <strong>and</strong> <strong>Protection</strong> Completed <strong>April</strong> 2010<br />

Baytree Freshwater Diversion Property Purchase<br />

East Bank Wastewater Assimilation Plant<br />

Blind River Freshwater Diversion Property Purchase<br />

West Bank Wastewater Assimilation Plant<br />

Waterline Booster Pump Station, East Bank Completed September 2011<br />

St. John the Baptist<br />

West Lac Des Allem<strong>and</strong>s Shoreline <strong>Protection</strong><br />

Reserve Relief Canal Shoreline <strong>Protection</strong><br />

St. Martin<br />

Bayou Amy Trail <strong>and</strong> Educational Pavilion<br />

Beau Bayou Swamp Hydrologic <strong>Restoration</strong><br />

Stephensville Sanitation System/Wastewater Assimilation<br />

St. Mary<br />

Burns Point Recreation Park Improvements Completed January 2011<br />

Deer Isl<strong>and</strong> Pass Realignment<br />

Morgan City Industrial Road<br />

Planning Assistance <strong>and</strong> Administration<br />

Point Chevreuil Shoreline <strong>Protection</strong><br />

Thorguson Road Improvements<br />

St. Tammany<br />

French Property Preservation Project Completed October 2009<br />

M<strong>and</strong>eville Aquatic Ecosystem <strong>Restoration</strong> Project Completed July 2010<br />

Green Property Preservation Project Completed August 2011<br />

Northshore Beach Marsh Creation/<strong>Restoration</strong><br />

Tangipahoa<br />

Lake Pontchartrain Shoreline <strong>Protection</strong><br />

Terrebonne<br />

Falgout Canal Freshwater Enhancement<br />

Vermilion<br />

Henry Hub Access – Charlie Field Rd. Bridge Completed <strong>April</strong> 2011<br />

Henry Hub Access – Charlie Field Road Improvements Completed February <strong>2012</strong><br />

Henry Hub Access Improvements – LA 331 Realignment<br />

Intracoastal City Street Improvements Completed November 2011<br />

North Prong Schooner Bayou Completed November 2010<br />

Oyster Reef Parallel to the Coastline at Chenier au Tigre<br />

Shoreline <strong>Protection</strong> <strong>and</strong> Marsh Creation at Tiger Point<br />

Shoreline <strong>Protection</strong> on SW Point at Southwest Pass<br />

Vermilion CIAP Planning Assistance <strong>and</strong> Administration<br />

Weeks Bay/Commercial Canal Feasibility Study<br />

Under<br />

Construction<br />

N/A<br />

N/A<br />

N/A<br />

N/A<br />

N/A<br />

Robert Routon<br />

CIAP Program<br />

Manager<br />

robert.routon@la.gov<br />

Chuck Perrodin<br />

Public Information<br />

Director<br />

chuck.perrodin2@la.gov<br />

David Williams<br />

Lead Program<br />

Manager<br />

david.williams@la.gov<br />

CIAP Contacts<br />

Travis Woodard<br />

CIAP Management<br />

Team<br />

travis.woodard@la.gov<br />

Brett Young<br />

CIAP Management<br />

Team<br />

brett.young@la.gov<br />

Michael Somme<br />

CIAP Management<br />

Team<br />

michael.somme@la.gov<br />

Joyce Johnson<br />

Chief of Policy<br />

Programs<br />

Joyce_Johnson@fws.gov<br />

CIAP Links<br />

www.lacpra.org www.dnr.louisiana.gov www.dotd.state.la.us www.fws.gov www.csrsonline.com<br />

This Program Update is funded in part with qualified outer continental shelf oil <strong>and</strong> gas revenues by the <strong>Coastal</strong> Impact Assistance Program, Bureau of Ocean Energy Management, Regulation, <strong>and</strong> Enforcement, U.S. Department of the Interior. The views <strong>and</strong> conclusions<br />

contained in this document are those of the authors <strong>and</strong> should not be interpreted as representing the opinions or policies of the U.S. Government. Mention of trade names or commercial products does not constitute their endorsement by the U.S. Government.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!