Slides - matpost 2003
Slides - matpost 2003
Slides - matpost 2003
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
# R T E<br />
RTE(EDF)-CN2i 2002<br />
Specification evolutions<br />
4<br />
Measure transformer (protection and measure)<br />
No usual limitation (compatibility with parc, with old protections)<br />
Need to be adapted to transit (from 500 A to 3125 A)<br />
Reduce number of different models form 26 to 8<br />
Combine circuit breaker – disconnector<br />
Exclude maintenance of chamber (synchronisation & resistance)<br />
Exclude low voltage maintenance (unless use of numeric control and command)<br />
Multi position disconnector<br />
Need separate command (to prevent modification of control and command)<br />
Need separate exploitation (for maintenance operation)<br />
Excluded if a single fault may exclude restart on one of the two bus bar<br />
Offer some supplementary control (risk of connection between bus bar & earth)