R<br />
#<br />
RTE(EDF)-CN2i 2002<br />
Gestionnaire<br />
du Réseau de Transport d 'Electricité<br />
T E<br />
Combine Equipment<br />
Specification<br />
Thursday 20th November <strong>2003</strong>
# R T E<br />
RTE(EDF)-CN2i 2002<br />
New strategy<br />
2<br />
Review specification to propose alternative<br />
Identify new technology risks and propose adapted<br />
constraints<br />
Take into account dependability and especially<br />
maintenance scenario to restart after serious failure<br />
Make access to theses technologies easier to RTE<br />
engineering office by simplifying definition
# R T E<br />
RTE(EDF)-CN2i 2002<br />
Different structures<br />
3<br />
Example of a line departure<br />
Line<br />
Bus bar 1<br />
Bus bar 2<br />
Identify generic needs from option needs<br />
Define functional characteristics<br />
Define association for maintenance
# R T E<br />
RTE(EDF)-CN2i 2002<br />
Specification evolutions<br />
4<br />
Measure transformer (protection and measure)<br />
No usual limitation (compatibility with parc, with old protections)<br />
Need to be adapted to transit (from 500 A to 3125 A)<br />
Reduce number of different models form 26 to 8<br />
Combine circuit breaker – disconnector<br />
Exclude maintenance of chamber (synchronisation & resistance)<br />
Exclude low voltage maintenance (unless use of numeric control and command)<br />
Multi position disconnector<br />
Need separate command (to prevent modification of control and command)<br />
Need separate exploitation (for maintenance operation)<br />
Excluded if a single fault may exclude restart on one of the two bus bar<br />
Offer some supplementary control (risk of connection between bus bar & earth)
# R T E<br />
RTE(EDF)-CN2i 2002<br />
Different kind of maintenance<br />
5<br />
External maintenance<br />
Contract for periodic maintenance<br />
Contract for intervention in case of failure<br />
Internal maintenance<br />
Formation for periodic maintenance<br />
Reserve for AIS combine equipment<br />
Strategy is the same as for other AIS equipment<br />
Reserve for GIS combine equipment with common phase<br />
One model for line departure (with few options) even from an other<br />
One model for cable departure<br />
Reserve can be used for other model or even other supplier<br />
Reserve for GIS combine equipment with independent phase<br />
Reserve cannot be used for other model<br />
Reserve is done with function modules<br />
Function modules have to be assembled before replacing the injured combine<br />
equipment
# R T E<br />
RTE(EDF)-CN2i 2002<br />
Different function association<br />
6<br />
HV – Commons phases<br />
Line Connections<br />
1 Bus bar Connection<br />
1 Disconnector<br />
1 Circuit Breaker<br />
1 Current Transformer<br />
1 Disconnector & Earth<br />
1 Voltage Transformer<br />
1 Surge Arrestor<br />
1 Line Connection<br />
HV – Commons<br />
phases Cable<br />
Connections<br />
1 Bus bar Connection<br />
1 Disconnector<br />
1 Circuit Breaker<br />
1 Current Transformer<br />
1 Voltage Transformer<br />
1 Disconnector & Earth<br />
1 Surge Arrestor<br />
1 Cable Connection<br />
HV & VHV –<br />
independent phases<br />
1 | 2 Bus bar Connection<br />
1 | 2 Disconnector<br />
1 Current Transformer<br />
1 Circuit Breaker<br />
1 Current Transformer<br />
1 Disconnector & Earth<br />
1 Voltage Transformer<br />
1 Disconnector & Earth<br />
1 Surge Arrestor<br />
1 Cable/Line
# R T E<br />
RTE(EDF)-CN2i 2002<br />
Conclusion<br />
7<br />
Results<br />
A new specification for RTE which is in accordance with the other specification<br />
A structure of document with try to be in accordance with IEC future standard<br />
For engineering, 45 parameters have to be defined to specify the combine equipment<br />
Bounds dues to environment<br />
Circuit breaker – disconnector in HV suppose using numerical control cubicle in RTE<br />
substation<br />
Measure transformer should be replace by electronic measurement systems to offer a<br />
standard for all kind of departure – This suppose an IEC communication standard and<br />
an offer from suppliers (protection, control & command…)