RTE(EDF)-CN2i 2002<br />

Gestionnaire<br />

du Réseau de Transport d 'Electricité<br />

T E<br />

Combine Equipment<br />

Specification<br />

Thursday 20th November <strong>2003</strong>


# R T E<br />

RTE(EDF)-CN2i 2002<br />

New strategy<br />

2<br />

Review specification to propose alternative<br />

Identify new technology risks and propose adapted<br />

constraints<br />

Take into account dependability and especially<br />

maintenance scenario to restart after serious failure<br />

Make access to theses technologies easier to RTE<br />

engineering office by simplifying definition


# R T E<br />

RTE(EDF)-CN2i 2002<br />

Different structures<br />

3<br />

Example of a line departure<br />

Line<br />

Bus bar 1<br />

Bus bar 2<br />

Identify generic needs from option needs<br />

Define functional characteristics<br />

Define association for maintenance


# R T E<br />

RTE(EDF)-CN2i 2002<br />

Specification evolutions<br />

4<br />

Measure transformer (protection and measure)<br />

No usual limitation (compatibility with parc, with old protections)<br />

Need to be adapted to transit (from 500 A to 3125 A)<br />

Reduce number of different models form 26 to 8<br />

Combine circuit breaker – disconnector<br />

Exclude maintenance of chamber (synchronisation & resistance)<br />

Exclude low voltage maintenance (unless use of numeric control and command)<br />

Multi position disconnector<br />

Need separate command (to prevent modification of control and command)<br />

Need separate exploitation (for maintenance operation)<br />

Excluded if a single fault may exclude restart on one of the two bus bar<br />

Offer some supplementary control (risk of connection between bus bar & earth)


# R T E<br />

RTE(EDF)-CN2i 2002<br />

Different kind of maintenance<br />

5<br />

External maintenance<br />

Contract for periodic maintenance<br />

Contract for intervention in case of failure<br />

Internal maintenance<br />

Formation for periodic maintenance<br />

Reserve for AIS combine equipment<br />

Strategy is the same as for other AIS equipment<br />

Reserve for GIS combine equipment with common phase<br />

One model for line departure (with few options) even from an other<br />

One model for cable departure<br />

Reserve can be used for other model or even other supplier<br />

Reserve for GIS combine equipment with independent phase<br />

Reserve cannot be used for other model<br />

Reserve is done with function modules<br />

Function modules have to be assembled before replacing the injured combine<br />

equipment


# R T E<br />

RTE(EDF)-CN2i 2002<br />

Different function association<br />

6<br />

HV – Commons phases<br />

Line Connections<br />

1 Bus bar Connection<br />

1 Disconnector<br />

1 Circuit Breaker<br />

1 Current Transformer<br />

1 Disconnector & Earth<br />

1 Voltage Transformer<br />

1 Surge Arrestor<br />

1 Line Connection<br />

HV – Commons<br />

phases Cable<br />

Connections<br />

1 Bus bar Connection<br />

1 Disconnector<br />

1 Circuit Breaker<br />

1 Current Transformer<br />

1 Voltage Transformer<br />

1 Disconnector & Earth<br />

1 Surge Arrestor<br />

1 Cable Connection<br />

HV & VHV –<br />

independent phases<br />

1 | 2 Bus bar Connection<br />

1 | 2 Disconnector<br />

1 Current Transformer<br />

1 Circuit Breaker<br />

1 Current Transformer<br />

1 Disconnector & Earth<br />

1 Voltage Transformer<br />

1 Disconnector & Earth<br />

1 Surge Arrestor<br />

1 Cable/Line


# R T E<br />

RTE(EDF)-CN2i 2002<br />

Conclusion<br />

7<br />

Results<br />

A new specification for RTE which is in accordance with the other specification<br />

A structure of document with try to be in accordance with IEC future standard<br />

For engineering, 45 parameters have to be defined to specify the combine equipment<br />

Bounds dues to environment<br />

Circuit breaker – disconnector in HV suppose using numerical control cubicle in RTE<br />

substation<br />

Measure transformer should be replace by electronic measurement systems to offer a<br />

standard for all kind of departure – This suppose an IEC communication standard and<br />

an offer from suppliers (protection, control & command…)