24.02.2015 Views

Stittsville transit meeting - Shad Qadri

Stittsville transit meeting - Shad Qadri

Stittsville transit meeting - Shad Qadri

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Possible peak service for Fringewood<br />

• Option is to re-route Route 261 via Fringewood instead<br />

of via Harry Douglas<br />

• Four morning trips to downtown, four return trips in<br />

the afternoon<br />

• Shorter walking distance for 14 customer-trips/day<br />

• Longer walking distance for 4 customer-trips/day<br />

• No significant change in operating cost<br />

18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!