25.02.2015 Views

Concrete Structures - Aker Solutions

Concrete Structures - Aker Solutions

Concrete Structures - Aker Solutions

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CONCEPTUAL RE-THINKING<br />

FIXED WH GBS MONOTOWERS<br />

•Minimum Ice load exposure<br />

•Eliminate need for GBS re-locations<br />

•Eliminate Subsea Silos<br />

CONCEPTUAL RE-THINKING - MOBILE TOPSIDE DRILLING FACILITY<br />

•No tow-to-field Topside weight, allowing slim WH Monotowers<br />

•Offshore mating by Jack-up mounted onto shaft top.<br />

•Jack-up legs pulled out of water to offer winter drilling operation<br />

•Jack-up based topside relocatable to multiple Monotowers<br />

Slide 24<br />

© 2010 <strong>Aker</strong> <strong>Solutions</strong> part of <strong>Aker</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!