Assessment of CFSRR medium range forecast skill
Assessment of CFSRR medium range forecast skill
Assessment of CFSRR medium range forecast skill
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Polar Orbiter Satellite Pr<strong>of</strong>iles<br />
• RTOVS (1979-1998)<br />
• TIROS-N, N06,…,N14 (N13 launch failure)<br />
• HIRS2(19) , MSU(4) , SSU(3)-omitted from N10, N12<br />
• ATOVS (1998 -<br />
• N15, N16, N17<br />
• HIRS3(19), AMSUA(15), AMSUB(5)<br />
• N18, N19<br />
• HIRS4(19), AMSUA(15), MHS(5)<br />
• Hyperspectral (thousands <strong>of</strong> channels…)<br />
• AQUA AIRS<br />
• Metop-a IASI<br />
• Retrievals<br />
• Fred Shuman, director NMC circa 1960’s ,<br />
• “Make it look like a rawindsonde”<br />
• GFS to 1998<br />
• R1 and R2, 250 km, 15 pressure levels (same as in 1979)