04.03.2015 Views

Poole Harbour Guide 2011 - Poole Harbour Commissioners

Poole Harbour Guide 2011 - Poole Harbour Commissioners

Poole Harbour Guide 2011 - Poole Harbour Commissioners

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Poole</strong> Bridges<br />

other public and private sector sources.<br />

The Twin Sails Bridge provides critical<br />

infrastructure for 26 hectares of brownfield<br />

land, one of the largest regeneration areas<br />

<strong>Poole</strong> Bridge Lifting Times<br />

• 05:30<br />

• 06:30<br />

• 07:30<br />

• 09:30<br />

• 10:30<br />

• 12:30<br />

• 14:30<br />

• 16:30<br />

• 17:30 *(Saturdays, Sundays & Bank Hols)<br />

• 18:30<br />

• 19:30<br />

• 21:30<br />

• 23:45<br />

in the South West. Over the next 10 to 15<br />

years, the regeneration is expected to<br />

deliver around 2,000 homes and create up<br />

to 5,000 jobs.<br />

Unscheduled Lifts<br />

Mariners need to check the Headroom<br />

Displays at the Bridge to judge if they can<br />

pass without requiring a lift.<br />

When hourly lifts are scheduled no ondemand<br />

lifts will be provided for<br />

commercial vessels except for those over<br />

40m long, or as directed by the <strong>Harbour</strong><br />

Master (i.e. no unscheduled lifts between<br />

05:00-08:00 or 16:00-20:00). This will<br />

ensure disruption to road traffic is kept to<br />

a minimum.<br />

37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!