Poole Harbour Guide 2011 - Poole Harbour Commissioners
Poole Harbour Guide 2011 - Poole Harbour Commissioners
Poole Harbour Guide 2011 - Poole Harbour Commissioners
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Poole</strong> Bridges<br />
other public and private sector sources.<br />
The Twin Sails Bridge provides critical<br />
infrastructure for 26 hectares of brownfield<br />
land, one of the largest regeneration areas<br />
<strong>Poole</strong> Bridge Lifting Times<br />
• 05:30<br />
• 06:30<br />
• 07:30<br />
• 09:30<br />
• 10:30<br />
• 12:30<br />
• 14:30<br />
• 16:30<br />
• 17:30 *(Saturdays, Sundays & Bank Hols)<br />
• 18:30<br />
• 19:30<br />
• 21:30<br />
• 23:45<br />
in the South West. Over the next 10 to 15<br />
years, the regeneration is expected to<br />
deliver around 2,000 homes and create up<br />
to 5,000 jobs.<br />
Unscheduled Lifts<br />
Mariners need to check the Headroom<br />
Displays at the Bridge to judge if they can<br />
pass without requiring a lift.<br />
When hourly lifts are scheduled no ondemand<br />
lifts will be provided for<br />
commercial vessels except for those over<br />
40m long, or as directed by the <strong>Harbour</strong><br />
Master (i.e. no unscheduled lifts between<br />
05:00-08:00 or 16:00-20:00). This will<br />
ensure disruption to road traffic is kept to<br />
a minimum.<br />
37