Disaster Management Plan 2011-12 of Cuttack District
Disaster Management Plan 2011-12 of Cuttack District
Disaster Management Plan 2011-12 of Cuttack District
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
D. Cost Units-The cost units provides all incident cost analysis. It ensures the proper identification<br />
<strong>of</strong> all equipments and personnel requiring payment, records all cost data, analysis and prepares<br />
estimates <strong>of</strong> incident costs, and maintains accurate records <strong>of</strong> incident costs.<br />
5.2 STANDARD OPERATING PROCEDURE (SOP)<br />
STANDARD OPERATING PROCEDURE (SOP)<br />
FOR DISTRICT EMERGENCY OPERATION CENTRE, CUTTACK<br />
TELEFAX: 91 – 671 - 2507842/2509059/1077 (Toll free)<br />
LOCATION: GROUND FLOOR, COLLECTORATE BUILDING, CUTTACK<br />
START IMMEDIATELY ON RECEIVING CYCLONE / FLOOD WARNING OR INFORMATION<br />
ABOUT ANY OTHER EMERGENCY FROM ANY SOURCE<br />
1. Officer in charge <strong>of</strong> EOC: The control room shall be in overall charge <strong>of</strong> the Collector. In the absence<br />
<strong>of</strong> Collector, ADM (Emergency), ADM (Revenue), PD DRDA, Emergency <strong>of</strong>ficer or any other <strong>of</strong>ficer or<br />
staff on duty at that point <strong>of</strong> time shall remain in charge <strong>of</strong> Control Room. The person in charge <strong>of</strong><br />
control room shall be personally responsible for implementing the SOP. S/he shall take all decisions<br />
as outlined below and sign for the Collector on all reports mentioned below. S/he shall not wait for<br />
orders from anybody.<br />
2. Assembly in Control Room: Following staff and <strong>of</strong>ficers shall assemble in the EOC on getting any<br />
information from any source about any emergency. Apart from these, any other <strong>of</strong>ficer or staff who<br />
gets the information from any source will reach the Control room.<br />
2.1. Collector, ADM, PD DRDA, APD, DRDA, DPC,SSA, Emergency Officer, Sub-Collector <strong>Cuttack</strong><br />
Sadar, Excise Superintendent, GM DIC, Tahsildar <strong>Cuttack</strong>, D.C, CMC, CSO, DIPRO and RTO.<br />
2.2. All staffs <strong>of</strong> emergency section, Stenos to Collector & ADM.<br />
3. Getting the Control Room ready: Following preparatory steps will be taken up for keeping the EOC<br />
functional during emergency.<br />
3.1. Shift two more phone lines to control room.<br />
3.2. Keep a radio with new batteries ready.<br />
3.3. Get the 2 generator sets ready.<br />
3.4. Stock 2 barrels <strong>of</strong> Kerosene and Diesel for running the generator sets.<br />
3.5. Charge the battery <strong>of</strong> VHF set <strong>of</strong> control room and staff car.<br />
3.6. Charge the battery <strong>of</strong> inverter.<br />
3.7. In case <strong>of</strong> cyclone warning, arrange four extra batteries.<br />
3.8. Charge the satellite phone and test it.<br />
4. Alert all field <strong>of</strong>ficers: BDOs, Tahasildars, MOs, VAS, Police, Industries, Telephone, Agriculture, RWSS,<br />
RD, R&B, ICDS, Irrigation, CESU, NH, PHD, Municipality, MLAs, MPs, MIs, CI/DI/Sis, Station Director,<br />
All India Radio. DIPRO shall inform the media. Warning shall be issued in the following format:<br />
45