16.03.2015 Views

Disaster Management Plan 2011-12 of Cuttack District

Disaster Management Plan 2011-12 of Cuttack District

Disaster Management Plan 2011-12 of Cuttack District

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

D. Cost Units-The cost units provides all incident cost analysis. It ensures the proper identification<br />

<strong>of</strong> all equipments and personnel requiring payment, records all cost data, analysis and prepares<br />

estimates <strong>of</strong> incident costs, and maintains accurate records <strong>of</strong> incident costs.<br />

5.2 STANDARD OPERATING PROCEDURE (SOP)<br />

STANDARD OPERATING PROCEDURE (SOP)<br />

FOR DISTRICT EMERGENCY OPERATION CENTRE, CUTTACK<br />

TELEFAX: 91 – 671 - 2507842/2509059/1077 (Toll free)<br />

LOCATION: GROUND FLOOR, COLLECTORATE BUILDING, CUTTACK<br />

START IMMEDIATELY ON RECEIVING CYCLONE / FLOOD WARNING OR INFORMATION<br />

ABOUT ANY OTHER EMERGENCY FROM ANY SOURCE<br />

1. Officer in charge <strong>of</strong> EOC: The control room shall be in overall charge <strong>of</strong> the Collector. In the absence<br />

<strong>of</strong> Collector, ADM (Emergency), ADM (Revenue), PD DRDA, Emergency <strong>of</strong>ficer or any other <strong>of</strong>ficer or<br />

staff on duty at that point <strong>of</strong> time shall remain in charge <strong>of</strong> Control Room. The person in charge <strong>of</strong><br />

control room shall be personally responsible for implementing the SOP. S/he shall take all decisions<br />

as outlined below and sign for the Collector on all reports mentioned below. S/he shall not wait for<br />

orders from anybody.<br />

2. Assembly in Control Room: Following staff and <strong>of</strong>ficers shall assemble in the EOC on getting any<br />

information from any source about any emergency. Apart from these, any other <strong>of</strong>ficer or staff who<br />

gets the information from any source will reach the Control room.<br />

2.1. Collector, ADM, PD DRDA, APD, DRDA, DPC,SSA, Emergency Officer, Sub-Collector <strong>Cuttack</strong><br />

Sadar, Excise Superintendent, GM DIC, Tahsildar <strong>Cuttack</strong>, D.C, CMC, CSO, DIPRO and RTO.<br />

2.2. All staffs <strong>of</strong> emergency section, Stenos to Collector & ADM.<br />

3. Getting the Control Room ready: Following preparatory steps will be taken up for keeping the EOC<br />

functional during emergency.<br />

3.1. Shift two more phone lines to control room.<br />

3.2. Keep a radio with new batteries ready.<br />

3.3. Get the 2 generator sets ready.<br />

3.4. Stock 2 barrels <strong>of</strong> Kerosene and Diesel for running the generator sets.<br />

3.5. Charge the battery <strong>of</strong> VHF set <strong>of</strong> control room and staff car.<br />

3.6. Charge the battery <strong>of</strong> inverter.<br />

3.7. In case <strong>of</strong> cyclone warning, arrange four extra batteries.<br />

3.8. Charge the satellite phone and test it.<br />

4. Alert all field <strong>of</strong>ficers: BDOs, Tahasildars, MOs, VAS, Police, Industries, Telephone, Agriculture, RWSS,<br />

RD, R&B, ICDS, Irrigation, CESU, NH, PHD, Municipality, MLAs, MPs, MIs, CI/DI/Sis, Station Director,<br />

All India Radio. DIPRO shall inform the media. Warning shall be issued in the following format:<br />

45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!