6. SUPPLY BY THE PURCHASER<br />
Items Not Included Within the Scope of Supply<br />
a) Civil Works not included.<br />
b) Preliminary Health & Safety plan.<br />
P 2 P<br />
<strong>PLASTIC</strong> <strong>TO</strong> <strong>PETROL</strong><br />
c) Infrastructure any necessary equipment and machinery to facilitate waste reception and<br />
handling systems upstream (loading) of the installation.<br />
d) Infrastructure and any equipment or necessary machine to facilitate dispatch of liquid<br />
fuel or gas.<br />
e) Location for accommodation to facilitate the installation and commissioning works.<br />
7. WARRANTIES, MAINTENANCE CONTRACT & SPARES<br />
The warranties provided on individual items of equipment or package units will be as given<br />
by the supplier of the respective item or package.<br />
Should additional warranties or maintenance contracts be required by the purchaser these<br />
will be negotiated on an individual basis, this is also concerning spare part listings (these<br />
items can be provided if the end engineering phase is finished).<br />
The entire equipment package as designed, manufactured, supplied, delivered and<br />
installed would be subject to as standard, a twelve months warranty period from the date<br />
of commissioning, and exact warranties for the complete system are subject to the<br />
composition of the input material<br />
A separate service and spares contract based on scheduled maintenance with spares<br />
holding will be subject to further negotiation.<br />
ALL our systems are ZERO air e mission