17.03.2015 Views

Energy Audit for St Mary Redcliffe Church, Bristol

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Medium Term<br />

Improvement<br />

Measures<br />

Description Estimated Cost Estimated Saving To be actioned by<br />

Install new LED SLS to advise<br />

SLS to advise<br />

lighting to replace<br />

existing fittings<br />

Install 3phase 100A £3,100 £480/year<br />

Voltage optimisation<br />

on mains electrical<br />

incomer<br />

Add an air curtain<br />

over the north door<br />

heated from the<br />

LPHW heating system.<br />

£3,000 Improved com<strong>for</strong>t<br />

Long Term<br />

Improvement<br />

Measures (with<br />

reordering)<br />

Description Estimated Cost Estimated Saving To be actioned by<br />

Add insulation to roof<br />

Improved com<strong>for</strong>t<br />

void<br />

Add insulation to void<br />

Improved com<strong>for</strong>t<br />

beneath pew<br />

plat<strong>for</strong>ms<br />

Replace boilers at end<br />

of life with high<br />

efficiency models and<br />

consider biomass.<br />

20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!