MBE WBE Report Q2 2013 - Chicago Park District
MBE WBE Report Q2 2013 - Chicago Park District
MBE WBE Report Q2 2013 - Chicago Park District
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Spec # Project Name Contractor Project Award Value <strong>MBE</strong> Commitment % <strong>WBE</strong> Commitment % Actual Payments <strong>MBE</strong> Actual % <strong>WBE</strong> Actual %<br />
P-11007-025 Hutchinson Field Design Renovation Smith Group JJR $ 51,372.79 $ 16,999.33 33% $ 9,765.00 19% $ 51,372.79 $ 16,999.33 33% $ 9,765.00 19%<br />
P-11007-026 Lucy Flower <strong>Park</strong> Wolff Landscape Architecture $ 34,170.00 $ 7,869.00 23% $ 3,200.00 9% $ 12,808.60 $ 2,165.00 17% $ 3,200.00 25%<br />
P-11007-027 Shabbona <strong>Park</strong> Playground Upland Design Ltd. $ 51,327.00 $ 20,025.00 39% $ 25,852.00 50% $ 39,079.89 $ 14,255.75 36% $ 20,943.24 54%<br />
P-11007-028 Rockwell Garden <strong>Park</strong> (#002) Site Design Group, Ltd. $ 230,599.00 $ 157,700.00 68% $ 42,100.00 18% $ 188,288.71 $ 132,759.00 71% $ 30,300.00 16%<br />
Capital Infrastructure Assessment <strong>District</strong> Wide Water<br />
P-11007-029<br />
and Sewer URS Corporation $ 67,760.00 $ - 0% $ 22,200.00 33% $ 64,971.09 $ - 0% $ 22,200.00 34%<br />
P-11007-030<br />
P-11007-031<br />
P-11007-032<br />
Sheridan <strong>Park</strong>-Façade and Roof Assessment Repairs<br />
Dunbar <strong>Park</strong> Field and Track<br />
Lincoln <strong>Park</strong>-Artificial Turf Field and Track<br />
Milhouse Engineering and<br />
Construction, Inc. $ 12,000.00 $ 11,000.00 92% $ 1,000.00 8% $ 3,960.00 $ 3,960.00 100% $ - 0%<br />
Hitchcock Design Group $ 100,135.00 $ 31,000.00 31% $ 8,635.00 9% $ 25,317.00 $ 4,500.00 18% $ 6,590.00 26%<br />
Terra Engineering Ltd. $ 167,000.00 $ 47,000.00 28% $ 120,000.00 72%<br />
P-11007-034<br />
P-11007-037<br />
P-11007-038<br />
P-11007-039<br />
P-11007-040<br />
P-11007-043<br />
P-11007-044<br />
Rainbow Beach <strong>Park</strong>- <strong>Park</strong>ing Lot Filtration Design and<br />
Construction Administration Service Contract<br />
Exp. U.S. Services inc. (dba:<br />
Teng & Associates) $ 51,186.00 $ 12,873.00 25% $ 2,668.00 5% $ 17,787.85 $ 6,700.00 38% $ - 0%<br />
<strong>District</strong> Wide Playgrounds - Design and Construction<br />
Administration Urban Works Ltd. $ 200,000.00 $ 190,000.00 95% $ 10,000.00 5%<br />
Pleasant Point and Riis <strong>Park</strong> Playgrounds<br />
Cornell (Paul) Square and Eckhart (Bernard) <strong>Park</strong>s,<br />
Site Design Group Ltd. $ 111,305.00 $ 67,555.00 61% $ 19,200.00 17%<br />
Playground, Landscaping, and Lighting Design and<br />
Construction Administration<br />
Hitchcock Design Group $ 80,500.00 $ 21,000.00 26% $ 11,400.00 14% $ 30,546.84 $ - 0% $ 3,946.84 13%<br />
Moore <strong>Park</strong> - Building Administration<br />
Grant (Ulysses) <strong>Park</strong> (#24) <strong>Park</strong> Development,<br />
Johnson & Lee, Ltd. $ 150,025.75 $ 62,725.75 42% $ 47,400.00 32%<br />
Landscaping, and Lighting Design and Construction<br />
Administration<br />
Robinson & Stairs and Stripes Playgrounds Landscape<br />
Altamanu, Inc. $ 126,215.18 $ 67,626.18 54% $ 13,192.00 10%<br />
Architecture Design Services Upland Design Ltd. $ 81,000.00 $ 28,500.00 35% $ 46,700.00 58%<br />
P-11007-045<br />
Coliseum <strong>Park</strong> - Playground and Site Improvements<br />
Site Design Group, Ltd. $ 29,100.00 $ 19,550.00 67% $ 5,800.00 20% $ 17,195.00 $ 14,030.00 82% $ 3,000.00 17%<br />
P-11007-047<br />
Architectural Documentation Management Services Milhouse Engineering &<br />
Construction, Inc. $ 58,889.11 $ 45,329.11 77% $ 13,560.00 23%<br />
Design & Engineering Services Project Award TOTALS: $ 9,569,803.45 $ 3,038,843.27 32% $1,470,649.52 15% $ 6,412,179.93 $ 1,526,429.33 24% $ 881,504.46 14%<br />
Shaded areas indicate no payment to date<br />
36