Launch Requirements - PSCR
Launch Requirements - PSCR
Launch Requirements - PSCR
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Policies and Procedures<br />
Public Safety Broadband<br />
! Life-‐cycle management <br />
! Security management <br />
! Network availability management <br />
Where requirements in this section reference consultations between FirstNet and Network <br />
Administrators, Network Administrators represent local, tribal, state, and federal authorities, as defined <br />
in Spectrum Act [1] sections 6206(c)(2) and 6302(d). <br />
Following are requirements for migration of private data networks. <br />
Table 8. Private Data Networks Migration <strong>Requirements</strong><br />
# Requirement<br />
1 FirstNet administration SHALL establish an advisory body to assist PSE jurisdictions in migrating <br />
existing private wireless network data connectivity onto the NPSBN. <br />
3.4 Network Interoperability Certification<br />
FirstNet should maintain network interoperability across the NPSBN. A certification process for network <br />
hardware and firmware should be developed, implemented, maintained, and enforced across all <br />
components of the network. Following are network certification requirements for interoperability. <br />
Table 9. Network Interoperability Certification <strong>Requirements</strong><br />
# Requirement<br />
1 FirstNet SHALL establish a certification process for all network hardware and firmware. <br />
2<br />
FirstNet SHALL establish a policy to insure that all applicable components of the network <br />
comply with the Network Interoperability Certification <strong>Requirements</strong>. <br />
3.5 Provisioning<br />
FirstNet should develop and maintain standard operating procedures at the local, tribal, state, and <br />
federal agency level that will define the process for provisioning users. These procedures should include <br />
adding, updating, and removing UE access from the NPSBN. A template for UE provisioning should be <br />
developed and maintained by FirstNet. Following are NPSBN requirements for provisioning. <br />
Table 10. Provisioning <strong>Requirements</strong><br />
# Requirement<br />
1 FirstNet SHALL develop and maintain standard operating procedures at the local, tribal, state, <br />
and federal agency level that will define the process for provisioning users. <br />
12 <strong>Launch</strong> Statement of <strong>Requirements</strong><br />
for FirstNet Consideration, December 2012