15.11.2012 Views

Operating manual 27.01.2010 Flow-through Chiller - HUBER

Operating manual 27.01.2010 Flow-through Chiller - HUBER

Operating manual 27.01.2010 Flow-through Chiller - HUBER

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Start up<br />

All models must be transported and installed in an upright position. Ensure stable<br />

positioning and security against tipping. Make sure that there is a sufficient supply of<br />

fresh air for the circulation pump and the compressors. The warm exhaust air must be<br />

able to exit freely toward upwards.<br />

The <strong>Flow</strong>-<strong>through</strong> <strong>Chiller</strong> is connected via the front housing with your temperature<br />

control circuit using connections M16x1 (please see drawing below). The temperature<br />

control thermostat (Heating circulator) thermal fluid outlet should always be connected<br />

to the lower connection of your <strong>Flow</strong>-<strong>through</strong> <strong>Chiller</strong> to guarantee better air purging.<br />

Trapped air in the temperature control circuit (<strong>Flow</strong>-<strong>through</strong> <strong>Chiller</strong>) can now escape<br />

<strong>through</strong> the bath. Connect your <strong>Flow</strong>-<strong>through</strong> <strong>Chiller</strong> with the mains cable at the back<br />

of the housing. Please note that the full cooling capacity can only be reached after<br />

5…10 min.<br />

Example:<br />

Outlet<br />

Inlet<br />

13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!