Start up<br />
All models must be transported and installed in an upright position. Ensure stable<br />
positioning and security against tipping. Make sure that there is a sufficient supply of<br />
fresh air for the circulation pump and the compressors. The warm exhaust air must be<br />
able to exit freely toward upwards.<br />
The <strong>Flow</strong>-<strong>through</strong> <strong>Chiller</strong> is connected via the front housing with your temperature<br />
control circuit using connections M16x1 (please see drawing below). The temperature<br />
control thermostat (Heating circulator) thermal fluid outlet should always be connected<br />
to the lower connection of your <strong>Flow</strong>-<strong>through</strong> <strong>Chiller</strong> to guarantee better air purging.<br />
Trapped air in the temperature control circuit (<strong>Flow</strong>-<strong>through</strong> <strong>Chiller</strong>) can now escape<br />
<strong>through</strong> the bath. Connect your <strong>Flow</strong>-<strong>through</strong> <strong>Chiller</strong> with the mains cable at the back<br />
of the housing. Please note that the full cooling capacity can only be reached after<br />
5…10 min.<br />
Example:<br />
Outlet<br />
Inlet<br />
13