- Page 1 and 2: PYRAMID CONSTRUCTION STAGES
- Page 3 and 4: Pyramid Construction After millenni
- Page 5 and 6: Site preparation for the constructi
- Page 7 and 8: After topping the gravel layer with
- Page 9: Next test was conducted and the hor
- Page 13 and 14: PHASE 2
- Page 15 and 16: Timber planks and plywood for the f
- Page 17: The next stage was the sheeting of
- Page 20 and 21: The veneered frames of the pyramida
- Page 22 and 23: Then began the construction of the
- Page 24 and 25: After finishing the forms and their
- Page 26 and 27: Next the steel reinforcement was pl
- Page 28 and 29: The strengthening with the reinforc
- Page 30 and 31: On 23rd July 2007 the external form
- Page 32 and 33: On 24 th July 2007 we poured 100 cu
- Page 34 and 35: Between the internal pyramid resona
- Page 36 and 37: On July 10, we planned to pour 140
- Page 38 and 39: Pouring the concrete around the wat
- Page 40 and 41: Once the first level was poured, we
- Page 42 and 43: On 20 th August 2007, we pored 94 c
- Page 44 and 45: At this stage the finished concrete
- Page 46 and 47: The forms have been removed from wa
- Page 48 and 49: This is after the forms from the fi
- Page 50 and 51: Reinforcement was installed and we
- Page 52 and 53: Here we will erect the forms of the
- Page 54 and 55: In the middle level (the area calle
- Page 56 and 57: Now it is time for the following le
- Page 58 and 59: When the central chamber vault form
- Page 60 and 61:
This is the entrance to the resonat
- Page 62 and 63:
The entrance into the resonator cha
- Page 64 and 65:
On October 23 we planned to pour ab
- Page 66 and 67:
We postponed pouring concrete by on
- Page 68 and 69:
On October 27, we started to add th
- Page 70 and 71:
The next day it snowed for the firs
- Page 72 and 73:
Here the internal chamber on the se
- Page 74 and 75:
The cone shaped resonator forms the
- Page 76 and 77:
The weather began to cooperate duri
- Page 78 and 79:
Despite the unpredictable weather,
- Page 80 and 81:
PHASE 7
- Page 82 and 83:
At last, the concrete pouring works
- Page 84 and 85:
Despite the fact that we came acros
- Page 86 and 87:
Straight behind the entrance there
- Page 88 and 89:
The entrance into one of the chambe
- Page 90 and 91:
And now we will return downstairs,
- Page 92 and 93:
While the expedition participants w
- Page 94 and 95:
After finishing the works on aligni
- Page 96 and 97:
Layer-by-layer dabbing with the spe
- Page 98 and 99:
The main idea of the system is for
- Page 100 and 101:
Already at this stage about the sid
- Page 102 and 103:
Next morning the adults climbed up
- Page 104 and 105:
As the mix, with which the pyramid
- Page 106 and 107:
The wall aligning in the side reson
- Page 108 and 109:
By 27 th July 2008 the northern sid
- Page 110 and 111:
The side surface has acquired an im
- Page 112 and 113:
The vault of the second store chamb
- Page 114 and 115:
The process of shearing all the unn
- Page 116 and 117:
PHASE 9
- Page 118 and 119:
But under the cave which is in the
- Page 120 and 121:
After we took the boxes into the py
- Page 122 and 123:
PHASE 10
- Page 124 and 125:
At this rare picture of the basemen
- Page 126 and 127:
At the same time they started the c
- Page 128 and 129:
On 19 September 2008 the support sc
- Page 130 and 131:
The tiles on the southern side have
- Page 132 and 133:
The northern and western sides have
- Page 134 and 135:
The field’s power increase is the
- Page 136:
The pyramid outer contour is prepar