ARCHITECTURE PORTFOLIO RICARDO CUELLAR
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
-<br />
- - -<br />
-<br />
-<br />
- - -<br />
3<br />
M<br />
4<br />
Parapet Flashing<br />
Wall Section<br />
Support Bracket<br />
3” Air Space<br />
Metall Cladding<br />
Plywood Sheathing<br />
6” Metal Stud<br />
6” Rigid Insulation<br />
Header Connection<br />
Bracket<br />
W8x10 -Flange Beam<br />
Roof Membrane<br />
Metal Decking<br />
Perforated Steel<br />
Mesh<br />
Plywood Sheathing<br />
3.5” Batt Insulation<br />
Interior Finish<br />
Copper Coping<br />
Store Front Window<br />
Plywood Sheathing<br />
Copper Panel<br />
Metal Stud<br />
6” Metal Stud<br />
Steel Grate<br />
5 Pa r a p te<br />
Rigid C.I.<br />
W12x26 Girder<br />
Metall Cladding<br />
Rigid Insulation<br />
8x31 Column<br />
Metal Cladding<br />
Support Bar<br />
Support Bracket<br />
Channel Track<br />
Air Space<br />
Plywood Sheathing<br />
Rigid C.I.<br />
Batt Insulation<br />
6” Meatl Stud<br />
e t a lCl a d d i nc go n n e cn<br />
t i o<br />
Window Sill<br />
Metal Decking<br />
Concrete<br />
Metal Cladding<br />
Channel Track<br />
Window Mullion<br />
3” Metal Tube<br />
Connection<br />
Concrete Fill<br />
Angle Iron<br />
Metal Stud Bracing<br />
S h a d i n D ge v i c eCo n n e c nt i o<br />
Piling Cap<br />
Project 1 Page 15