Attachments 11.4 and 11.5 - City of Busselton
Attachments 11.4 and 11.5 - City of Busselton
Attachments 11.4 and 11.5 - City of Busselton
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
LAND inSights<br />
ATTACHMENT A – DRAFT LEPS ITEM <strong>11.5</strong> COUNCIL 12/10/2011<br />
Executive Summary<br />
with guidance on key environmental matters relating to development <strong>and</strong> l<strong>and</strong> use planning.<br />
More specific consideration has also been provided for areas where development pressures<br />
are expected to be greatest – <strong>Busselton</strong>/Vasse <strong>and</strong> Dunsborough/Commonage.<br />
Within each section <strong>of</strong> the report consideration has been given to what the desired<br />
environmental outcomes are <strong>and</strong> how these can be achieved through the l<strong>and</strong> use planning<br />
system.<br />
Vision<br />
The overall vision for the Local Environmental Planning Strategy is:<br />
The Shire <strong>of</strong> <strong>Busselton</strong> will accommodate its current <strong>and</strong> future populations in<br />
environmentally sustainable communities characterised by settlements that recognise<br />
<strong>and</strong> embrace the physical <strong>and</strong> environmental features <strong>of</strong> the Shire.<br />
Areas <strong>of</strong> environmental <strong>and</strong> cultural significance will be identified <strong>and</strong> protected by the<br />
Shire’s planning framework, which will result in l<strong>and</strong> use <strong>and</strong> development being<br />
environmentally sensitive.<br />
Environmental issues<br />
The LEPS focuses on the key environmental issues relating to development <strong>and</strong> l<strong>and</strong> use<br />
planning <strong>and</strong> outlines the objectives, strategies <strong>and</strong> actions for each. The environmental<br />
issues discussed in this report are:<br />
• Biodiversity<br />
• Water, wetl<strong>and</strong>s <strong>and</strong> watercourses<br />
• L<strong>and</strong>scape <strong>and</strong> l<strong>and</strong> qualities<br />
• Coastal management <strong>and</strong> foreshores<br />
• Basic Raw Materials<br />
A summary <strong>of</strong> each <strong>of</strong> the environmental issues, including objectives, strategies <strong>and</strong> actions,<br />
are presented below. Actions have been assigned a priority as follows:<br />
• I: Immediate term – within the next financial year<br />
• M: Medium term – within the next five years<br />
• L: Long term – 5+ years<br />
• O: Ongoing – as required.<br />
VER 1 – FINAL DRAFT<br />
Shire <strong>of</strong> <strong>Busselton</strong> Local Environmental Planning Strategy<br />
Report 3 – Objectives, Strategies <strong>and</strong> Actions<br />
November 2010<br />
Page 2