08.04.2015 Views

Transport Asset Management Plan - Halton Borough Council

Transport Asset Management Plan - Halton Borough Council

Transport Asset Management Plan - Halton Borough Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Halton</strong> <strong>Borough</strong> <strong>Council</strong><br />

<strong>Transport</strong> <strong>Asset</strong> <strong>Management</strong> <strong>Plan</strong><br />

3.4.3 <strong>Asset</strong> <strong>Management</strong> Systems<br />

Table 12 Street Lighting and other Electrical Highway <strong>Asset</strong> Summary<br />

<strong>Asset</strong> Inventory Format Content & Coverage<br />

Street Lighting Data on Mayrise database and paper copies 100% Coverage; Numbers, location and<br />

unit details and condition.<br />

Lit signs Data on Mayrise database and paper copies 100% Coverage; Numbers, location and<br />

unit details and condition.<br />

Lit bollards Data on Mayrise database and paper copies 100% Coverage; Numbers, location and<br />

unit details and condition.<br />

Frequency<br />

of Update<br />

or Review<br />

See 3.4.2<br />

above<br />

See 3.4.2<br />

above<br />

See 3.4.2<br />

above<br />

Procedure<br />

In Place<br />

Yes<br />

Yes<br />

Yes<br />

Unlit signs<br />

Paper copies, 1800 number are recorded on<br />

Mayrise<br />

Coverage uncertain See 3.4.2<br />

above<br />

Yes<br />

Traffic signals Data on Mayrise database and paper copies 100% Coverage; Numbers, location and<br />

unit details and condition.<br />

Continuous<br />

Yes<br />

Puffin, Pelican, Toucan<br />

and Zebra crossings<br />

Data on Mayrise database and paper copies<br />

100% Coverage; Numbers, location and<br />

unit details and condition.<br />

See 3.4.2<br />

above<br />

Yes<br />

Variable message signs /<br />

Journey time monitoring<br />

system<br />

Data on Mayrise database and paper copies 100% Coverage Continuous<br />

Yes<br />

<strong>Asset</strong>s are maintained by Term Maintenance Contractors: -<br />

Street lighting contract with MEWS commenced Autumn 2005 on a 5+5 year’s term contract basis.<br />

Traffic control equipment is maintained by Traffic Systems Co-operative under a contract commenced in April 2004 on 3 + 2 years term contract.<br />

FinalversionLprovisional0.doc<br />

30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!