<strong>SHP</strong> <strong>in</strong> Ch<strong>in</strong>a<br />
Table 3 <strong>Electrification</strong> of the third batch of 335 counties (1996-2000)<br />
No. Item Before After<br />
electrification electrification<br />
1 Installed capacity (MW) 3,650 5,650<br />
2 Annual generation (10 6 kWh) 14,800 18,000<br />
3 Per capita power use (kWh) 143 208<br />
4 Domestic production value 234,500 477,800<br />
(10 6 RMB Yuan)<br />
5 F<strong>in</strong>ancial revenue of counties 15,000 25,500<br />
(10 6 RMB Yuan)<br />
6 Annual mean net <strong>in</strong>come of 1,082 1,914<br />
farmers (RMB Yuan)<br />
km of transmission l<strong>in</strong>es with 110kV volv<strong>in</strong>g 24 prov<strong>in</strong>ces or cities, nearly<br />
voltage or above were newly set up, 200 million people, and an area of<br />
together with 42,036 km of 35 (63kV) about 2 million km 2 .<br />
transmission l<strong>in</strong>es and 225,000 km of<br />
10 kV distribution l<strong>in</strong>es.<br />
2 Pr<strong>in</strong>ciples and policies of rural<br />
By the end of 2000, there was a electrification<br />
total <strong>in</strong>stalled power capacity of 20,<br />
265MW <strong>in</strong> the 653 hydro-<strong>based</strong> primary<br />
In order to effectively promote the<br />
rural electrification counties, of development of the pilot rural electri-<br />
which the hydro <strong>in</strong>stalled capacity fication counties, the State Council<br />
amounted to 17,697 MW. The generation<br />
issued a special document, which<br />
<strong>in</strong> 2000 reached 68,250 GWh, def<strong>in</strong>ed the policies that the govern-<br />
and 59,770 GWh came from ment would adopt for electrification<br />
hydropower. There were 822 substations<br />
of the pilot rural counties.<br />
of 110 kV and above, with a ca-<br />
(1) Policies for the first batch of 100<br />
pacity of 23,440,000 kVA, and 4,280 pilot rural electrification counties<br />
of 35 (63) kV substations with a capacity<br />
On December 12, 1983, the State<br />
of 21,380,000 kVA. Council promulgated the [1983] 190<br />
Furthermore, there were 30,059 km of Document, which clarified various<br />
transmission l<strong>in</strong>es of 110 kV and questions about relevant policies and<br />
above, 95,253 km of 35 (63) kV, and management systems.<br />
694,100 km of 10 kV distribution l<strong>in</strong>es. In order to help <strong>SHP</strong> develop cont<strong>in</strong>uously<br />
After complet<strong>in</strong>g the third batch<br />
and steadily, <strong>SHP</strong> con-<br />
of primary electrification counties struction carried out at the county<br />
dur<strong>in</strong>g the “9th Five-year Plan” (1996- level and above shall be listed <strong>in</strong> the<br />
2000) period, the per capita annual net local capital construction plan <strong>in</strong> the<br />
<strong>in</strong>come of farmers rose from 1,082 future, so as to ensure the supply of<br />
Yuan to 1,914 Yuan. Dur<strong>in</strong>g the “10th essential goods, materials or<br />
Five-year Plan” (2001-2005) period, equipment. The <strong>in</strong>vestment for all<br />
Ch<strong>in</strong>a is go<strong>in</strong>g to <strong>in</strong>vest over 70 billion<br />
<strong>SHP</strong> stations which are collectively<br />
Yuan to build another 400 hydro-<br />
owned or which are self-built, self-<br />
<strong>based</strong> rural electrification counties, so managed and with self-consumption<br />
as to promote the development of the by the farmers themselves do not<br />
rural economy. 80% of these 400 need to be <strong>in</strong> the State plan <strong>in</strong> order<br />
counties will be <strong>in</strong> the central and to avoid dampen<strong>in</strong>g their enthusiasm.<br />
west regions, and 85% belong to the Construction funds for <strong>SHP</strong> stations<br />
former revolutionary, ethnic, remote<br />
should ma<strong>in</strong>ly rely on local<br />
and poverty-stricken districts, <strong>in</strong> f<strong>in</strong>anc<strong>in</strong>g, with the central govern-<br />
local people. In those counties with<br />
4 www.hrcshp.org <strong>SHP</strong> NEWS Autumn 2004<br />
ment offer<strong>in</strong>g support as necessary.<br />
From 1985, it is proposed to allocate<br />
100 million Yuan every year from the<br />
power <strong>in</strong>frastructure <strong>in</strong>vestment budget<br />
to support some county-run small<br />
power stations. If these stations are<br />
really profitable, a certa<strong>in</strong> proportion<br />
of profit should be collected to support<br />
<strong>SHP</strong> construction <strong>in</strong> other places.<br />
Implement the policy of “Electricity<br />
supports electricity”. The profit<br />
of newly built <strong>SHP</strong> stations and the<br />
wholesale profit from power grid<br />
sales to counties should not be <strong>in</strong>cluded<br />
<strong>in</strong> the local f<strong>in</strong>ancial budget.<br />
All <strong>in</strong>come, except production costs<br />
(<strong>in</strong>clud<strong>in</strong>g salary, materials, depreciation<br />
of fixed assets and major repair<br />
costs) and planned loan repayments,<br />
should be used for develop<strong>in</strong>g <strong>SHP</strong><br />
stations and local small power grids.<br />
Cont<strong>in</strong>uously implement the low<strong>in</strong>terest<br />
loan policy for <strong>SHP</strong><br />
development. From January 1984, the<br />
agricultural loan <strong>in</strong>terest rate was adjusted<br />
to 0.6% per month on average,<br />
and a new monthly <strong>in</strong>terest rate band<br />
was set rang<strong>in</strong>g from 0.36% to 0.72%.<br />
In order to motivate production teams<br />
and rural households to develop<br />
<strong>SHP</strong>, it is proposed to grant loans for<br />
procur<strong>in</strong>g equipment for newly built<br />
<strong>SHP</strong> stations at the low end of the<br />
band, i.e. a monthly <strong>in</strong>terest rate of<br />
0.36%. Meanwhile, the loan repayment<br />
time was extended from the orig<strong>in</strong>ally<br />
stipulated 3-5 years to 10 years<br />
<strong>in</strong> case of necessity. The profits<br />
should be firstly used to repay loans<br />
accord<strong>in</strong>g to contract, and the rest<br />
can then be used for “support<strong>in</strong>g<br />
electricity with electricity”.<br />
Regard<strong>in</strong>g <strong>SHP</strong> management,<br />
those <strong>SHP</strong> stations, thermal power<br />
plants, power grids, w<strong>in</strong>d-power<br />
stations, geothermal power plants<br />
and other rural power projects which<br />
are built by local production teams<br />
should be run and managed by the