16.04.2015 Views

SHP-based Rural Electrification in China - Hangzhou Regional ...

SHP-based Rural Electrification in China - Hangzhou Regional ...

SHP-based Rural Electrification in China - Hangzhou Regional ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>SHP</strong> <strong>in</strong> Ch<strong>in</strong>a<br />

Table 4 Development of Hydropower-<strong>based</strong> primary rural electrification counties <strong>in</strong> Ch<strong>in</strong>a<br />

Item The first<br />

batch<br />

Year 1998 Year 1999 Year 2000<br />

The second<br />

batch<br />

The third<br />

batch<br />

The first<br />

batch<br />

The second<br />

batch<br />

The third<br />

batch<br />

The first<br />

batch<br />

The second<br />

batch<br />

The third<br />

batch<br />

Irrigated area (km 2 ) 305,957 827,032 2,033,307 305,955 795,834 2,017,823 298,310 793,307 1,981,649<br />

Irrigated arable land (km 2 ) 21,099 59,322 88,793 20,816 55,771 94,206 20,420 56,870 101,710<br />

Dra<strong>in</strong>age & irrigation area<br />

with electricity (km 2 )<br />

2,106 7,260 7,484 2,007 7,475 7,908 1,931 6,085 9,740<br />

Total population <strong>in</strong> irrigated<br />

area (10 3 )<br />

33,652 74,533 118,236 33,797 76,791 119,291 33,589 74,988 137,359<br />

Number 1,898 3,972 6,170 1,907 3,951 6,179 1,892 3,968 7,253<br />

Counties<br />

supplied with<br />

electricity<br />

Villages<br />

supplied with<br />

electricity<br />

Families<br />

supplied with<br />

electricity<br />

Proportion<br />

with electricity<br />

%<br />

100.0 100.0 98.9 100.0 99.9 99.1 99.9 99.9 99.9<br />

Number 29,305 58,493 86,758 29,578 58,003 79,865 29,201 57,966 89,833<br />

Proportion<br />

with electricity<br />

%<br />

99.8 98.9 94.9 99.9 99.2 97.8 99.9 99.5 99.3<br />

Number 9,715,912 18,968,844 27,494,577 8,888,125 18,584,317 28,821,436 8,943,955 19,718,902 34,331,472<br />

Proportion<br />

with electricity<br />

%<br />

98.4 97.3 92.6 98.8 94.6 95.6 98.7 98.0 97.6<br />

Year-end Total (kW) 4,563,084 6,636,496 5,496,724 5,115,144 7,000,075 6,063,075 5,531,768 7,266,322 7,467,178<br />

<strong>in</strong>stalled Hydro<br />

capacity (kW)<br />

4,240,501 5,746,442 4,501,787 4,788,187 6,024,290 4,894,135 5,195,278 6,411,890 6,090,234<br />

Newly Total<br />

<strong>in</strong>stalled (kW)<br />

449,365 537,935 475,624 468,657 568,593 576,661 641,921 361,705 614,286<br />

capacity <strong>in</strong> Hydro<br />

the year (kW)<br />

408,355 476,495 392,213 465,957 422,289 437,214 641,921 347,368 556,670<br />

Installed capacity<br />

under Total (kW) Hydro (kW) 990,915 985,353 1,110,682 817,820 910,511 1,047,173 863,830 1,092,970 1,235,950<br />

990,915 940,353 1,030,482 817,820 818,151 984,973 863,830 1,056,970 1,235,950<br />

construction<br />

Accumulated <strong>in</strong>vestment<br />

(10 3 Yuan)<br />

15,104,650 22,931,450 14,556,380 18,648,460 25,877,980 21,200,140 22,424,820 31,426,610 33,005,390<br />

<strong>SHP</strong> NEWS Autumn 2004 www.hrcshp.org 9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!