3.1.8.5 Connection <strong>of</strong> Internal Services Systems with external services<br />

net<strong>work</strong>.<br />

3.1.8.6 Furniture for R&D laboratories, Auditorium & o<strong>the</strong>r build<strong>in</strong>gs.<br />

3.1.9 The detailed <strong>work</strong><strong>in</strong>g draw<strong>in</strong>gs to <strong>in</strong>clude flow/schematic diagrams, plans,<br />

elevations, sections, blow-ups etc for <strong>in</strong>dividual services complete with material take <strong>of</strong>f.<br />

3.1.10 Designate a qualified Structural Eng<strong>in</strong>eer, who shall be wholly and s<strong>in</strong>gly<br />

<strong>res</strong>ponsible for structural soundness and safety <strong>of</strong> <strong>the</strong> build<strong>in</strong>gs/ structu<strong>res</strong> design under its scope.<br />

3.1.11 Preparation <strong>of</strong> detailed structural analysis & structural design calculations<br />

(<strong>in</strong>clud<strong>in</strong>g seismic design <strong>as</strong> applicable) b<strong>as</strong>ed on design output, preparation <strong>of</strong> detailed structural<br />

draw<strong>in</strong>gs.<br />

3.1.12 Collection <strong>of</strong> <strong>in</strong>put data from Employer/Manufacturers/vendors and design<br />

structural foundations (<strong>in</strong>clud<strong>in</strong>g dynamic analysis <strong>as</strong> applicable) for <strong>in</strong>dividual plant & equipment to<br />

be <strong>in</strong>stalled. The structural designs to cater for specialized requirements <strong>per</strong>ta<strong>in</strong><strong>in</strong>g to special<br />

equipments.<br />

3.1.13 Preparation <strong>of</strong> bar bend<strong>in</strong>g schedules and/or detailed re<strong>in</strong>forcement<br />

draw<strong>in</strong>gs sufficient to enable <strong>the</strong> contractor to procure <strong>the</strong> steel from <strong>the</strong> market and<br />

cutt<strong>in</strong>g/bend<strong>in</strong>g and plac<strong>in</strong>g <strong>of</strong> <strong>the</strong> re<strong>in</strong>forcement..<br />

3.1.14 Preparation <strong>of</strong> fabrication/ construction/ shop draw<strong>in</strong>gs <strong>in</strong>clud<strong>in</strong>g material<br />

take <strong>of</strong>f etc. complete.<br />

3.1.15 Detailed design, consider<strong>in</strong>g load data, Noise and Vibrations <strong>of</strong> equipments,<br />

draw<strong>in</strong>gs, cost estimates and specifications to cover all civil <strong>work</strong>s <strong>as</strong>sociated with <strong>in</strong>stallation <strong>of</strong> all<br />

mechanical/ electrical equipment, services and systems.<br />

3.1.16 Preparation <strong>of</strong> detailed specifications and data sheets for materials, <strong>work</strong><br />

items, systems and services etc.<br />

3.1.17 Preparation <strong>of</strong> detailed quantity estimates supported by detailed<br />

me<strong>as</strong>urement sheets/ material take <strong>of</strong>f sheets b<strong>as</strong>ed on detailed draw<strong>in</strong>gs.<br />

3.1.18 Preparation and submission <strong>of</strong> detailed cost estimates for build<strong>in</strong>gs,<br />

structu<strong>res</strong>, services & systems b<strong>as</strong>ed on latest CPWD Schedule <strong>of</strong> Rates with necessary <strong>in</strong>dices and<br />

correction slips, if any, applied <strong>the</strong>reupon. Preparation <strong>of</strong> rate analysis for <strong>the</strong> items, which are not<br />

available <strong>in</strong> CPWD-SOR, b<strong>as</strong>ed on market rate quotations. Any deviation <strong>in</strong> quantity, items also to be<br />

supported by rate analysis. Also preparation <strong>of</strong> abstract <strong>of</strong> quantities build<strong>in</strong>g wise or package wise,<br />

<strong>as</strong> required.<br />

3.1.19 Preparation <strong>of</strong> detailed ‘ Bill <strong>of</strong> Quantities’ for Tender purposes for <strong>in</strong>dividual<br />

build<strong>in</strong>gs/ structu<strong>res</strong> and a consolidated statement <strong>the</strong>re<strong>of</strong>.<br />

3.1.20 Preparation <strong>of</strong> list <strong>of</strong> recommended makes/ manufacturers for<br />

recommendations & approval <strong>of</strong> Eng<strong>in</strong>eer/ PMC.