28.04.2015 Views

1 board for industrial and financial reconstruction bench iii case no ...

1 board for industrial and financial reconstruction bench iii case no ...

1 board for industrial and financial reconstruction bench iii case no ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Case No.93/1987<br />

M/s Alluminium Industries Ltd<br />

requ ired to be u n derta ken a ga in s t th e Com pa n y u n der s ection 24 of<br />

SICA <strong>for</strong> m is fea s a n ce, m a lfea s a n ce, brea ch of tru s t on th e ba s is of<br />

com pla in ts filed by workers u n ion a n d oth ers , a n d s u bm it its report<br />

to the Board within 6 weeks.<br />

(v<strong>iii</strong>) Th e Boa rd will a p poin t 3 profes s ion a l directors <strong>for</strong> th e Com pa n y,<br />

(ix)<br />

wh o<br />

will a ls o exa m in e a ll th e fa cts a n d circu m s ta n ces of th e ca s e<br />

a n d s u bm it th eir report to th e Boa rd <strong>for</strong> ea rly reviva l of th e Com pa n y<br />

within 2 months.<br />

Th e Opera tin g Agen cy s h a ll exa m in e a n y Dra ft Reh a bilita tion Sch em e<br />

proposal in respect of 5 units except Hirkund division <strong>and</strong> submit the<br />

same to the Board <strong>for</strong> further necessary action in due course.<br />

8.3 Th e Boa rd vide order da ted 24.9.08 is s u ed a corrigen du m to th e<br />

proceedings of the hearing held on 10.7.08.<br />

9. In th e h ea rin g h eld on 21.4.09, th e Ben ch is s u ed th e followin g<br />

directions :-<br />

(i) Th e com pa n y s h a ll s u bm it a fu lly tied u p DRS a fter obta in in g th e<br />

con s en t of th e s ecu red creditors <strong>for</strong> OTS to Sta te Ba n k of<br />

Tra va n core (SBT)(OA) with in a period of 3 m on th s a s u n derta ken<br />

by th e com pa n y in th e h ea rin g toda y. Th e com pa n y a n d its<br />

prom oters a re pu t on n otice th a t u n les s a fu lly tied u p DRS is<br />

received by th e Boa rd with in th ree m on th s , th e Ben ch m a y<br />

exa m in e oth er option s u n der SICA in clu din g ch a n ge of<br />

m a n a gem en t in th e n ext h ea rin g a s th e referen ce of th e com pa n y<br />

has been pending with BIFR since 1987.<br />

(ii) M/ s . Pridh vi As s et Recon s tru ction a n d Secu ritiza tion Co. Ltd.<br />

(PARAS) s h ou ld s en d a copy of th eir im plea dm en t a pplica tion<br />

da ted 28.11.2008 to th e com pa n y u n der copy to th e OA (SBT)<br />

with in a period of 15 da ys . Th e com p a n y m a y file th eir rejoin der<br />

with in a n oth er 15 da ys u n der copy to th e OA (SBT) a n d PARAS.<br />

The company should specifically state their legal objections, if any,<br />

10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!