12.05.2015 Views

Company profile - Intrakat

Company profile - Intrakat

Company profile - Intrakat

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Infrastructure projects<br />

Rail projects<br />

Infrastructure projects<br />

Natural gas<br />

21<br />

01<br />

02<br />

ERGA OSE S.A. (Hellenic Railways Organisation<br />

Projects) – Construction of the infrastructure for a<br />

new railway line, stations and stops on the Kiato–<br />

Rododafni section<br />

C.F.R.S.A. (Romanian National Railway<br />

<strong>Company</strong>) – Modernisation of the CED system and<br />

construction of the railway station’s control centre<br />

building in Timisoara, Romania<br />

03<br />

04<br />

C.F.R.S.A. (Romanian National Railway <strong>Company</strong>)<br />

– Modernisation of the CED system of the railway<br />

station in Bucharest<br />

C.F.R.S.A. (Romanian National Railway <strong>Company</strong>)<br />

– Reconstruction of the railway station in Oradea,<br />

Romania<br />

01<br />

02<br />

EPA ATTIKIS S.A. – (Attiki Gas Supply <strong>Company</strong>) –<br />

Construction of a gas distribution network in the<br />

period 2002–2006, 441km polyethylene and 39km<br />

steel pipelines<br />

EPA ATTIKIS S.A. – Construction of natural gas<br />

pipeline and distribution network in southern and<br />

central Attica, 238km polyethylene and 10km steel<br />

pipelines<br />

03<br />

04<br />

DEPA S.A. – Maintenance of the natural gas<br />

transport system and its facilities – Northern<br />

Sector (from Koula to Platamonas and Komotini)<br />

Prometheus GAS S.A. – Civil engineering works for<br />

the construction of the high volume natural gas<br />

supply pipeline from Komotini to Alexandroupoli,<br />

length 54km<br />

01<br />

Airports<br />

01 Construction of new air terminal buildings for the 02<br />

state airport in Karpathos<br />

Construction of new manoeuvring area for the<br />

state airport of Paros<br />

02<br />

01. Railway works<br />

02. Karpathos state airport<br />

High volume natural gas supply pipeline, Komotini – Alexandroupoli

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!