13.05.2015 Views

Download

Download

Download

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MMC Norilsk Nickel Annual Report 2009<br />

The key operating assets of Taimyr Peninsula<br />

One of the main resources that will enable Norilsk Nickel to overcome the<br />

current economic downturn and lay the foundations for future expansion<br />

is an efficient management system. This will help the Company to be<br />

adaptable, flexible and efficient.<br />

Norilsk Nickel has taken the following actions in order to streamline the<br />

management structure:<br />

• created a management structure suitable for a diversified international<br />

major, one with defined areas of responsibility and a high level<br />

of transparency;<br />

• decentralized responsibility: delegation of the appropriate authority<br />

to heads of divisions;<br />

• reduced headcount and general and administrative costs; and<br />

• improved efficiency of the Company operations.<br />

In 2009, the efforts to develop the database of internal management<br />

documentation also continued.<br />

MINING AND METALLURGICAL BUSINESS UNIT<br />

The main goal of the Mining and Metallurgical business unit is to ensure<br />

a stable output at minimal cost and in compliance with production<br />

plans approved by the head office and the Sales business unit. The<br />

development of the Company’s mineral resources, the increase in<br />

ore extraction as well as the optimization of Company’s production<br />

capacities are key to achieving this.<br />

The Mining and Metallurgical business unit comprises extracting,<br />

concentrating and metallurgical entities located in Russia (Taimyr<br />

and Kola peninsulas), Australia, Botswana, Finland, the USA and the<br />

Republic of South Africa.<br />

Russia<br />

Taimyr Peninsula<br />

The Taimyr Peninsula is located in Russia above the Polar Circle, on the<br />

69th parallel. It is linked to other regions of the country via the Yenisei<br />

river, the Northern Sea Route as well as by air.<br />

Seven Taimyr Peninsula mines produce copper-nickel sulfide ores from<br />

the Oktyabrsky, Talnakh, and Norilsk-1 deposits. Ores mined have<br />

different contents of nickel, copper, platinum, palladium, cobalt, gold<br />

and other useful components.<br />

Ore is enriched at the Talnakh and Norilsk Concentrators. The Talnakh<br />

Concentrator processes rich ores mined at the Oktyabrsky and Talnakh<br />

deposits to produce nickel, copper and pyrrhotite concentrates. The<br />

Norilsk Concentrator processes the entire volume of disseminated and<br />

cuprous ores from the Oktyabrsky and Talnakh deposits, and stockpiled<br />

pyrrhotite concentrate to produce nickel and copper concentrates.<br />

Dudinka<br />

Nadezhda<br />

Metallurgical Plant<br />

Alykel airport<br />

Talnakh Concentrator<br />

Kayerkan<br />

Talnakh<br />

Mayak mine<br />

Copper Plant<br />

Zapolyarny mine<br />

Oktyabrsky mine<br />

Norilsk<br />

Norilsk Concentrator<br />

Taimyrsky<br />

mine<br />

Komsomolsky<br />

mine<br />

Skalisty mine<br />

Nickel Plant<br />

Medvezhy<br />

Ruchey<br />

open pit<br />

In the Taimyr Peninsula, metallurgical operations include the Nadezhda<br />

Metallurgical, Nickel and Copper Plants.<br />

The Nadezhda Metallurgical Plant processes all the nickel and pyrrhotite<br />

concentrates produced by the Talnakh Concentrator, some of the nickel<br />

concentrates from the Norilsk Concentrator (about 15%), and all copper<br />

concentrate from high-grade matte separation area of the Nickel<br />

Plant roasting shop to produce high-grade matte, copper anodes and<br />

elementary sulfur.<br />

The Nickel Plant processes the largest part of nickel concentrate<br />

produced by the Norilsk Concentrator (about 85%), all enriched<br />

stockpiled pyrrhotite concentrate, and some high-grade matte from the<br />

Nadezhda Metallurgical Plant, to produce nickel cathodes and cobalt.<br />

The Copper Plant processes the entire volume of copper concentrates<br />

produced by the Talnakh and Norilsk Concentrators and copper<br />

anodes from the Nadezhda Metallurgical Plant to produce copper<br />

cathodes, elementary sulfur and sulfuric acid. The Metallurgical Shop,<br />

which is a division of the Copper Plant, recycles sludge from the copper<br />

electrolysis and the nickel electrolysis shops to produce precious metal<br />

concentrate, metallic silver, selenium and tellurium.<br />

The Company has outsourced the refining of precious metal<br />

concentrates from the Taimyr Peninsula under a tolling agreement to<br />

the Krasnoyarsk Precious Metals Plant.<br />

18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!