15.05.2015 Views

View Architectural Guidelines PDF - Colorado Time Systems

View Architectural Guidelines PDF - Colorado Time Systems

View Architectural Guidelines PDF - Colorado Time Systems

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Aquatics Venue Site Worksheet<br />

continued<br />

New construction in-deck wiring<br />

(if there will not be in-deck wiring, skip this section)<br />

CTS experts are available to assist in creating drawings for bid proposal, equipment<br />

specification, and construction process.<br />

If drawings are available, ensure they are up to date and include all of this information:<br />

l Wall plates: locations, size and function (include setup/sport configurations to be<br />

used at each box)<br />

l Deck plates: locations, manufacturers’ part number (ie. Carlon E989NNR-4” x 4” x<br />

6”, Carlon E987 4” x 4” x 4”, Scepter JB446 4” x 4” x 6”, or other)<br />

l Conduit runs and sizes<br />

If drawings are not available, make a sketch of the pool detailing all of the above<br />

information.<br />

Pace Clocks<br />

Which of these functions will be used?<br />

Training Functions<br />

Display Functions<br />

Water Polo Swimming Diving<br />

Pacing Shot Clock Lane <strong>Time</strong> DD/position<br />

Splits Game Clock Event/Heat Current Round/Diver<br />

Start Reaction <strong>Time</strong>s <strong>Time</strong> Out Clock<br />

Relay Exchanges<br />

Team Scores<br />

Lap Counter<br />

How many permanently mounted clocks are required?<br />

Recessed or surface mounted: RECESSED SURFACE<br />

How many portable clocks are required?<br />

Are tripods needed for the portable clocks? YES NO<br />

+1 (970) 667-1000<br />

page 30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!