Suggestions for JQint Procedure Order {JPO)<br />

:J<br />

r -Sf____ D_r_a._ft_J_P_O_s_u_b_m_i._tt_e_d __ b_y_c_tw ________________._s_u_gg_e_s~-io_n_s_____ nt----1--~-ith-as<br />

been decided by Rly--. 8-d-.-t-ha_t_A_s--s-ly-. o_f_n_e_w-+-lt_h_a_s-be_e_n-de-c-id-e·-d-by_R_ly-.--8-d- . ...;,th--a-t_a_ssembly of<br />

Elect. Locos will be done at Elect. Loco Workshop, new Elect. Locos will be done at Electric Loco<br />

1/ BSL/C Rly. & Dahod Loco Work Shop/W Rly. To Workshop, Bhusawdi/Central Railwdy ~~ Dahod<br />

begin with 02 i'los.3 phase loco at BSL and 5 Nos. Lm;o Workshop/Western Railway. To begin with<br />

of conventional locos at Dahod will be assembled 02 Nos. three phase loco at Bhusawal and 5 Nos. of<br />

during the current financial year i.e. 2010-11. conventional locos at Dahod will be assembled<br />

during the current financial year i.e. 2010-11.<br />

·----1<br />

To, meet the above objectives, following To meet the above objectives, following procedure<br />

procedure order shall be followed by CLW and order shall be followed by CLW and Western &<br />

concerned Railways.<br />

Central Railway.<br />

There will be a cell at CLW to co-ordinate with There will be a cell at CLW to co-ordinate with<br />

respective Railways in respect of manufacture of these two Zonal Railways in respect of<br />

. Locomotives at Bhuswal and Dahod Workshops. manufacture of Locomotives at Bhusawal and<br />

This shall be headed by CEE (L&S)/CLW and will Datwd Workshops. This shall be headed by CEE<br />

have staff drawn from Stores branch and (L&S)/CLW and will have staff drawn from Stores<br />

technical branch. Similar Cells wil,l be established branch and technical branch. Similar Cells will be<br />

at both the Workshops.<br />

established at both the Workshops.<br />

·----·----!-<br />

Electric Loco Workshop, Bhusawa~/Central<br />

4. ELW/BSL/Central Railway" & Dahod<br />

Workshop/W.Railway wiif submit a detailed<br />

estimate for their portion of the cost duly vetted<br />

by their associate finance to CEE(L&S)/CLW.<br />

Thereafter, CEE(L&S)/CLW will place a Work<br />

Order duly vetted by CLW Accounts along with<br />

Batch No. and Loco No. on ELW/BSL and D,ahod<br />

Workshop and workshops will confirm the<br />

acceptance of work order.<br />

RaUway & Dahod Workshop/Western Railway will<br />

submit a detailed estimate for their portion of the<br />

cost, which ·should ideally be /i'Jpited to labour<br />

cost, workshopoverheads and consumables only,<br />

duly vetted by their associate finance to<br />

CEE(L&S)/CLW. Thereafter, CEE(L&S)/CLW will<br />

place a Work Order duly vetted by FA & CAO/CLW<br />

along with Batch No. and Loco No. on Elect:ric Loco<br />

Workshop, Bhusawal and Dahod Workshop and<br />

workshops will confirm the acceptance of work<br />

r----r-----------------~------------~---4-o_r_dE __ ~r_. ____________________________ ~<br />

I 5. All the materials for the assembly of these All the materials for the assembly of: these<br />

electric locos shall be arranged by CLW for the electric locos shall be arranged by CLW for the<br />

workshops in question. These materials would workshops in question. These materials would<br />

include both bought out items and shop include both bought out items · and shop<br />

manufactured items.<br />

manufactured items.<br />

~----+- ---------------------------~<br />

6. Ali transfer of material will be through the stores All transfer of material will be through the stores<br />

branch of CLW. The material will· be issued from branch of CLW. The material will be issued from<br />

Stores Deptt to foreign railway workshops against Stores Deptt to ·Central & Western J'?ailway<br />

the batch no. of locomotives mentioned in the workshops against the batch no. of locomotives<br />

work order and debited to the CLW's WMS. 'mentioned in the work order .and debiited to<br />

the CLW' s WMS<br />

7. The material will be issued in the presence of DSK The material will be issued in the presence of DSK<br />

& Technical Supervisor of the concerned foreign & Technical Supervisor of the concerned foreign<br />

railways who will be deputed to CLW for this railways who will be deputed to CLW for this<br />

purpose. Final dispatch of materials from CLW to purpose. Final dispatch of materials from CLW to<br />

foreign Railway Workshops would also be Central & Western Railway Workshops would also<br />

l-·---·-~itnessed by Accounts Stock Verifiers/~LW. --------' be ~titnessed by_ Accounts Stock Verifiers I CLW.