17.05.2015 Views

schedule of drawings and standard drawings

schedule of drawings and standard drawings

schedule of drawings and standard drawings

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTION III<br />

PART D - SCHEDULE OF DRAWINGS<br />

AND<br />

STANDARD DRAWINGS


SCHEDULE OF DRAWINGS<br />

Contract No.: 16-2008/2009<br />

Sheet<br />

Number<br />

Drawing<br />

Number<br />

Description<br />

GENERAL DRAWINGS<br />

Cover Sheet<br />

1 <strong>of</strong> 19 1461 Locality Plan <strong>and</strong> Table Of Contents<br />

2 <strong>of</strong> 19 1462 Typical Cross Sections <strong>and</strong> Pavement Details<br />

3 <strong>of</strong> 19 1463 Pavement Construction Geometry Plan <strong>and</strong> Co-Ordinates<br />

4 <strong>of</strong> 19 1464 Pavement Construction Alignment Plan Ch 2580.00 – Ch 2920.00<br />

5 <strong>of</strong> 19 1465 Pavement Construction Alignment Plan Ch 2820.00 – Ch 3200.00<br />

6 <strong>of</strong> 19 1466 Pavement Construction Alignment Plan Ch 3160.00 – Ch 3317.00<br />

7 <strong>of</strong> 19 1467 Pavement Construction Longitudinal Section Ch 2580 – Ch 2980<br />

8 <strong>of</strong> 19 1468 Pavement Construction Longitudinal Section Ch 2980 – Ch 3340<br />

9 <strong>of</strong> 19 1469 Cross Sections Ch 2600 – Ch 2640<br />

10 <strong>of</strong> 19 1470 Cross Sections Ch 2660 – Ch 2700<br />

11 <strong>of</strong> 19 1471 Cross Sections Ch 2715 – Ch 2760<br />

12 <strong>of</strong> 19 1472 Cross Sections Ch 2780 – Ch 2840<br />

13 <strong>of</strong> 19 1473 Cross Sections Ch 2860 – Ch 2876<br />

14 <strong>of</strong> 19 1474 Cross Sections Ch 2880 – Ch 2940<br />

15 <strong>of</strong> 19 1475 Cross Sections Ch 2960 – Ch 3020<br />

16 <strong>of</strong> 19 1476 Cross Sections Ch 3040 – Ch 3100<br />

17 <strong>of</strong> 19 1477 Cross Sections Ch 3120 – Ch 3180<br />

18 <strong>of</strong> 19 1478 Cross Sections Ch 3200 – Ch 3260<br />

19 <strong>of</strong> 19 1479 Cross Sections Ch 3280 – Ch 3318<br />

STANDARD DRAWINGS<br />

SD 1061C<br />

SD 1301C<br />

SD 2001D<br />

SD 2051<br />

SD 3541F<br />

SD 3543B<br />

SD 3551B<br />

SD 3561C<br />

SD 3571B<br />

SD 3611D<br />

SD 3661F<br />

SD 1981C<br />

SD1101 B<br />

Lintels<br />

Side Entry Pit Concrete Cover<br />

Kerbs<br />

Kerbs Outlet to Beaching<br />

Breakaway Cable Terminal (BCTA) General Arrangement<br />

Post Detail <strong>and</strong> Breakaway Cable Terminal<br />

BCT Anchor Cable <strong>and</strong> Plate Details<br />

BCT End Rail <strong>and</strong> Terminal Bulb Details<br />

BCTA Runout Area Grading Details<br />

Guard Fence (Type B) Timber Post<br />

Guard Fence (Type B) Steel Post<br />

Reinforced Concrete Wingwall for Box Culverts 600mm to 900mm high<br />

Inlet Catch Pit (Typical)


SECTION IV – GEOTECHNICAL INVESTIGATIONS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!