26.05.2015 Views

RUSSULA NEWSLETTER No. 11

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SPOTLIGHT<br />

Russula opens office in Yaroslavl<br />

Russula is pleased to announce the opening of its 6th<br />

international office in Yaroslavl, Russian Federation.<br />

The opening of the new office will boost Russula´s presence<br />

within the Russian market.<br />

In 20<strong>11</strong>-2012, Russula provided the design, equipment<br />

supply and construction supervision of a water treatment<br />

plant for the JSC Severstal Long Product Mill Balakovo<br />

located in the Saratov region. During the course<br />

of the project Russula settled permanently in Russia,<br />

opening an office in Yaroslavl, which is responsible for<br />

serving the entire country.<br />

Over the past two years, Russula has provided the<br />

engineering, mechanical and electrical equipment<br />

supply, construction supervision, testing and<br />

commissioning of a complete water treatment plant for<br />

Severstal´s new 1 Mtpy state-of-the-art steel plant,<br />

located in the Balakovo, Saratov region in Russia.<br />

“Russula´s water treatment plant technology is unique<br />

in that it is designed specifically for the steel industry.<br />

The closed loop circuit reutilizes rain and melted snow<br />

from the region making it a very ecofriendly process.”<br />

says General manager Ruslan Shulegin of LLC<br />

Russula Engineering in Russia.<br />

Yaroslavl was selected as the new office location due to<br />

its convenient location and availability of qualified<br />

technical staff. The city is located 260 km from the Russian<br />

capital Moscow; its close proximity to airports and<br />

transportation hubs allows easy travel mobility around<br />

Russia. At the same time Yaroslavl is a developed industrial<br />

city with a high level of education to ensure the<br />

selection of qualified technical staff.<br />

“Overall we believe that Russia has great potential for<br />

new projects such as the modernization and renovation<br />

of existing metallurgical facilities. Using process<br />

control to improve product quality has become a key<br />

topic recently among Russian rolling mills. Electrical<br />

revamps are Russula´s core competence with over 240<br />

projects successfully completed worldwide.” affirms<br />

Ruslan Shulegin.<br />

Russula Newsletter <strong>No</strong>. <strong>11</strong> April 2015 - Copyright © by <strong>RUSSULA</strong> S.A. 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!