RUSSULA NEWSLETTER No. 11
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SPOTLIGHT<br />
Russula opens office in Yaroslavl<br />
Russula is pleased to announce the opening of its 6th<br />
international office in Yaroslavl, Russian Federation.<br />
The opening of the new office will boost Russula´s presence<br />
within the Russian market.<br />
In 20<strong>11</strong>-2012, Russula provided the design, equipment<br />
supply and construction supervision of a water treatment<br />
plant for the JSC Severstal Long Product Mill Balakovo<br />
located in the Saratov region. During the course<br />
of the project Russula settled permanently in Russia,<br />
opening an office in Yaroslavl, which is responsible for<br />
serving the entire country.<br />
Over the past two years, Russula has provided the<br />
engineering, mechanical and electrical equipment<br />
supply, construction supervision, testing and<br />
commissioning of a complete water treatment plant for<br />
Severstal´s new 1 Mtpy state-of-the-art steel plant,<br />
located in the Balakovo, Saratov region in Russia.<br />
“Russula´s water treatment plant technology is unique<br />
in that it is designed specifically for the steel industry.<br />
The closed loop circuit reutilizes rain and melted snow<br />
from the region making it a very ecofriendly process.”<br />
says General manager Ruslan Shulegin of LLC<br />
Russula Engineering in Russia.<br />
Yaroslavl was selected as the new office location due to<br />
its convenient location and availability of qualified<br />
technical staff. The city is located 260 km from the Russian<br />
capital Moscow; its close proximity to airports and<br />
transportation hubs allows easy travel mobility around<br />
Russia. At the same time Yaroslavl is a developed industrial<br />
city with a high level of education to ensure the<br />
selection of qualified technical staff.<br />
“Overall we believe that Russia has great potential for<br />
new projects such as the modernization and renovation<br />
of existing metallurgical facilities. Using process<br />
control to improve product quality has become a key<br />
topic recently among Russian rolling mills. Electrical<br />
revamps are Russula´s core competence with over 240<br />
projects successfully completed worldwide.” affirms<br />
Ruslan Shulegin.<br />
Russula Newsletter <strong>No</strong>. <strong>11</strong> April 2015 - Copyright © by <strong>RUSSULA</strong> S.A. 2