26.05.2015 Views

RUSSULA NEWSLETTER No. 11

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RECENT PROJECTS<br />

Gerdau places its confidence in Russula to revamp the<br />

rolling mill and continuous caster in Cartersville, GA<br />

The control system upgrade for the bar mill includes:<br />

- New main control cabinet supply and installation,<br />

disconnecting and rewiring local field signals<br />

- Replace existing PLC with an ABB PM891 from the<br />

AC800M family<br />

- New Siemens Simotion shear positioning system<br />

- Remote unit modification to communicate by<br />

Profibus DP without disconnecting any signal<br />

field units<br />

- Integration of new control system within the<br />

data acquisition IBA network<br />

- Development of the full development and<br />

implementation of the control system and HMI<br />

according Russula quality standards and customer<br />

requirements<br />

Multi-phase startup for continuous caster<br />

The continuous caster will undergo a multi-phase<br />

revamp approach where one strand will be<br />

commissioned this September and the remaining three<br />

strands in December of this year.<br />

The existing control and power equipment for the 4<br />

strand continuous caster will be upgraded with Allen<br />

Bradley automation systems. This project illustrates the<br />

high flexibility Russula offers when faced with different<br />

technological solutions and its total independence from<br />

electrical equipment manufacturers.<br />

To modernize the current AC drives and control<br />

system, five PLCs type AB PLC5 (4 for the lines and 1<br />

for the common controls) will be replaced with new AB<br />

ControlLogix 1756 L7 processors. The existing Control<br />

Technique drives will be replaced with new AB<br />

PowerFlex 755 series.<br />

The current GE iFix HMI system will be kept in place<br />

and readapted to communicate with the new<br />

processors.<br />

MAIN DATA<br />

NO. DESCRIPTION START-UP DATE<br />

Project 1 DC drive upgrade for stands 1-12, shears 6 & 12, and cooling bed December 2014<br />

Project 2 New rolling mill control system September 2015<br />

Project 3 Control system and AC drive upgrade for continuous caster September 2015 (1 strand)<br />

December 2015 (3 strands)<br />

Russula Newsletter <strong>No</strong>. <strong>11</strong> April 2015 - Copyright © by <strong>RUSSULA</strong> S.A. 8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!