MAINTENANCE WORKS<br />
In <strong>2006</strong>, two non-routine maintenance campaigns were performed<br />
at the Pyramid International Laboratory-Observatory<br />
and lodge.<br />
The first campaign was carried out between January and<br />
March. The objective was to prepare installation of the ABC<br />
Station (operational since from March <strong>2006</strong>), being installed<br />
within the framework of UNEP sponsored international monitoring<br />
network. A new photovoltaic system specifically for<br />
the ABC station was installed and a shelter built to house the<br />
scientific instruments. During this campaign, the technicians<br />
also had to deal with unexpected additional work, specifically<br />
rebuilding the roof of the lodge which was destroyed in a<br />
wind storm. In order to make it possible to transfer the data<br />
collected at the ABC-Pyramid station to Italy in real time, a<br />
VSAT satellite system was also installed.<br />
The second campaign, held in August and September, was<br />
aimed at concluding the maintenance works needed to<br />
reduce the power consumption at the Pyramid and improve<br />
the sanitary and heating systems to ensure the well-being of<br />
the Pyramid guests. The heating system was updated and<br />
and a solar-thermal water heating system was installed<br />
which also provides an integration to the current heating system.<br />
The technicians who have been involved in the maintenance<br />
works were: Guido Salton, Ulisse Frosio, Marco Pesenti,<br />
Andrea Salton, Daniele Palazzina, Ugo Pegurri, Marco Vallesi,<br />
Giuseppe Orlandi, Alberto Previtali, Carlo Sacchi and<br />
Giovanni Spada.<br />