ar<strong>2006</strong> 19-09-2007 10:36 Pagina 21<br />

tion of the project through <strong>CNR</strong> reinforces the interaction<br />

between Italian research institutions and the Government’s<br />

political action. The MIUR and MAE (Ministero degli Affari<br />

Esteri – Italian Ministry of Foreign Affairs) are in fact increasingly<br />

oriented towards development of international cooperation<br />

activities with a scientific basis.<br />

As far as the current status of the single initiatives within the<br />

Karakorum Trust framework is concerned, the main achievements<br />

of <strong>2006</strong> can be summarized as follows:<br />

- The EARTH system (Ecological Activity for Refuse Treatment<br />

in High altitude©) has been developed in collaboration with<br />

Actelios of the Italian Industrial Group Falck. A prototype was<br />

made and tested in Italy on Plateau Rosa at an altitude of<br />

3,400 metres a. s. l.. The unit, which is completely environment<br />

friendly, was presented at a press conference on July<br />

26, <strong>2006</strong> and will be first installed in 2007 in the Northern<br />

Areas of Pakistan (Askole Village, Braldo Valley) and then in<br />

Sagarmatha National Park in Nepal.<br />

- Within the framework of the Karakorum Trust programme,<br />

the <strong>Ev</strong>-K 2 -<strong>CNR</strong> Committee and the Alpine Club of Pakistan<br />

organized a clean-up expedition of the Baltoro Glacier. The<br />

waste collected, totalling over 3 tons of solid material, have<br />

been stored near Askole Village (Braldo Valley, Northern<br />

Areas of Pakistan), where the EARTH unit will be installed in<br />

2007;<br />

- A programme for improving the dwellings of the Braldo<br />

Valley was formulated by the <strong>Ev</strong>-K 2 -<strong>CNR</strong> Committee, in collaboration<br />

with Milan Polytechnic, the Italian Institute for<br />

Africa and the East and agencies of the Aga Khan<br />

Foundation. The programme, to be implemented in 2007,<br />

may also include the creation of a development fund (adopting<br />

typical microfinance mechanisms ), to enhance the effectiveness<br />

of existing financial resources and benifitting from<br />

the participation of local communities;<br />

- An operational agreement was finalised with Karakurum<br />

International University in Gilgit, regarding training and<br />

involvement of Pakistani Academic Staff in the international<br />

research projects implemented by the <strong>Ev</strong>-K?-<strong>CNR</strong><br />

Committee;<br />

- A project for the creation of a centre for the analysis, processing<br />

and distribution of gemstones at the Karakurum<br />

International University of Gilgit, in collaboration with the<br />

I.G.I. (Italian Gemological Institute) in Milan was developed.<br />

Ten graduates of Gilgit University will be selected in 2007<br />

and trained at the Italian Gemological Institute of Milan in<br />

the analysis and cutting of coloured gemstones. The aim of<br />

the project is the consolidation of professional, technical and<br />

entrepreneurial skills, a future catalyst of sustainable economic<br />

development;<br />

- Drafts of Memoranda of Understanding with the Pakistan<br />

Meteorological Department and WWF Pakistan have been<br />

prepared and discussed. The agreement with WWF Pakistan<br />

regards joint activities to be carried out in support of the<br />

CKNP management plan development and implementation;<br />

- A draft for a Memorandum of Understanding between the<br />

<strong>Ev</strong>-K 2 -<strong>CNR</strong> Committee and the Ministry of Kashmir Affairs<br />

and Northern Areas has been discussed with the Joint<br />

Secretary, aimed at establishing a collaboration within the<br />

framework of the Karakorum Trust Programme. The MoU<br />

will be finalised in 2007.<br />

- A project for the creation of a reception point/campsite at<br />

the main access point to the Baltoro Glacier (“The Baltoro<br />

Gate”) was drawn up in collaboration with the Department<br />

of Design and Architecture of Milan Polytechnic. Preliminary<br />

activities (planting of trees – 20,000 willows and poplars –<br />

and creating a water supply) are currently underway, thanks<br />

to collaboration with the local communities and stakeholders<br />

such as the Aga Khan Rural Support Programme;<br />

- The first course for Trekking Leaders, organized in partnership<br />

with the Alpine Club of Pakistan, was conducted in<br />

December <strong>2006</strong>. The course was much appreciated by<br />

Pakistan’s Ministry of Tourism and by local communities.<br />

More courses will be held in 2007;<br />

annual report <strong>2006</strong>