07.07.2015 Views

Attachment 1 Statement of Work dated December 2012

Attachment 1 Statement of Work dated December 2012

Attachment 1 Statement of Work dated December 2012

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TORFP GJKZ 09-0063ATTACHMENT 12.04: Submittals: Submittals shall include but not be limited to grounding rods, bonding wire,joint fill, concrete repair, epoxy system repair, paint, shop drawings and work schedule.2.05: WORK SCHEDULE: Normal contract work hours pertain to this project. Weekendwork shall not be allowed. Due to the impact <strong>of</strong> the work on the facility and the high demand forthe use <strong>of</strong> the facility during winter months, the following provisions apply to when the work canbe conducted:2.05.1 Only one hangar in Building 2050 shall be available at a time for contractor work.<strong>Work</strong> shall not take longer than 2 weeks for any particular hangar bay to allow forrequired aircraft maintenance.2.05.2 Physical work requiring the user to vacate aircraft from the hangar shall not bescheduled at a time any <strong>of</strong> the other hangers are unavailable for aircraft maintenance.2.05.3 The contractor shall coordinate the physical work period(s) with the ContractingOfficer’s representative at least two weeks in advance to request the closing <strong>of</strong> a hangarbay.3.0 SPECIFICS OF WORK3.1 Demolition3.1.1: Dispose <strong>of</strong> demolition debris IAW with FAFB BDS requirements.3.2 Construction3.2.1 General: In the concrete floor <strong>of</strong> each <strong>of</strong> the four hangars is a construction joint.The joint extends along the centerline <strong>of</strong> each hangar. The contractor shall install fourstatic grounds at the locations indicated on the Appendix drawings. The locations are in aline following along the construction joint. The Contractor shall open the constructionjoint as needed to install the static grounds. All static grounds shall be bonded to eachother and to the steel columns <strong>of</strong> the building. Provide in accordance with UFC 3-260-01and UFC 3-757-01.3.2.2. Static ground rod: Provide in accordance with UFC 3-260-01 Section B11-5 AirForce Tiedowns and Static Grounds. See appendix for example <strong>of</strong> ground rod.3.2.2. Electrical bonding conductors: Provide #4 AWG solid copper bonding wire. Runthe bonding wire in the hangar centerline construction joint. Open the joint as needed toinstall the conductor. Install the bonding cable at least two inches below finished floor.Connect the bonding conductor to each static ground rod and to the building columnusing an exothermal process similar and equal to Cadweld.Page 2 <strong>of</strong> 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!