10.08.2012 Views

Fallback and Recovery Specification (FRS)

Fallback and Recovery Specification (FRS)

Fallback and Recovery Specification (FRS)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DG TAXUD – EXCISE COMPUTERISATION PROJECT REF: ECP2-FITSDEV2-SC03-<strong>FRS</strong><br />

FALLBACK AND RECOVERY SPECIFICATION (<strong>FRS</strong>) VERSION: 3.11-EN<br />

Specific provisions during the rollout of EMCS<br />

8.1.5 Interruption of a movement<br />

The interruption of a movement is not included in FS1 but only in FS2. However the<br />

business need exists both at business level <strong>and</strong> at technical level where there is no<br />

business way to close a movement.<br />

A specific exception addressing the permanent unavailability of the interruption use case<br />

is therefore defined.<br />

ECP2-FITSDEV2-SC03-<strong>FRS</strong>v3.11.doc Page 53 of 53

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!