10.07.2015 Views

BME 4900 Final Report - Biomedical Engineering - University of ...

BME 4900 Final Report - Biomedical Engineering - University of ...

BME 4900 Final Report - Biomedical Engineering - University of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

32 <strong>BME</strong> <strong>4900</strong> <strong>Final</strong> <strong>Report</strong>Team 87.2 TimelineThis table is a summary <strong>of</strong> all the specified tasks for the project. A Micros<strong>of</strong>t Projectversion <strong>of</strong> this data may be found on the projects website at:.Name Duration Start Finish PredecessorsAnalyze FHN circuit parameters 1 wk 10/17/11 10/21/11Research case manufacturers 1 wk 10/17/11 10/21/11Analyze excitatory synapse circuit parameters 1 day 10/24/11 10/24/11Analyze inhibitory synapse circuit parameters 1 day 10/26/11 10/26/11Analyze dendrite circuit behavior 2 wks 10/27/11 11/9/11Test excitatory synapse connection in Multisim 1 day 10/31/11 10/31/11 1,2Test inhibitory synapse connection in Multisim 1 day 11/1/11 11/1/11 1,3Design LLBN axon hillock 1 day 11/10/11 11/10/11 1Design EBN axon hillock 1 day 11/10/11 11/10/11 1Design TN synapses 1 day 11/10/11 11/10/11 15,2Design LLBN synapses 1 day 11/11/11 11/11/11 3,5,2Design EBN synapses 1 day 11/11/11 11/11/11 3,10,2Design LLBN dendrites 1 day 11/14/11 11/14/11 6,4Design EBN dendrites 1 day 11/14/11 11/14/11 11,4Design TN dendrites 1 day 11/14/11 11/14/11 16,4Design LLBN axon timing circuit 1 day 11/15/11 11/15/11 7Design EBN axon timing circuit 1 day 11/15/11 11/15/11 12Design TN axon timing circuit 1 day 11/15/11 11/15/11 17Assemble LLBN in Multisim 1 day 11/16/11 11/16/11 5,6,7,8Assemble EBN in Multisim 1 day 11/16/11 11/16/11 10,11,12,13Assemble TN in Multisim 1 day 11/16/11 11/16/11 15,16,17,18Design OPN axon hillock 1 day 11/17/11 11/17/11 1Design IBN axon hillock 1 day 11/17/11 11/17/11 1Design AN axon hillock 1 day 11/17/11 11/17/11 1Design OPN synapses 1 day 11/18/11 11/18/11 20,3Design IBN synapses 1 day 11/18/11 11/18/11 25,3Design AN synapses 1 day 11/18/11 11/18/11 30,2Test neuron pair where both syanpses exist inMultisim2 days 11/2/11 11/3/11 1,2,3Design OPN dendrites 1 day 11/28/11 11/28/11 21,4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!