BME 4900 Final Report - Biomedical Engineering - University of ...
BME 4900 Final Report - Biomedical Engineering - University of ...
BME 4900 Final Report - Biomedical Engineering - University of ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
32 <strong>BME</strong> <strong>4900</strong> <strong>Final</strong> <strong>Report</strong>Team 87.2 TimelineThis table is a summary <strong>of</strong> all the specified tasks for the project. A Micros<strong>of</strong>t Projectversion <strong>of</strong> this data may be found on the projects website at:.Name Duration Start Finish PredecessorsAnalyze FHN circuit parameters 1 wk 10/17/11 10/21/11Research case manufacturers 1 wk 10/17/11 10/21/11Analyze excitatory synapse circuit parameters 1 day 10/24/11 10/24/11Analyze inhibitory synapse circuit parameters 1 day 10/26/11 10/26/11Analyze dendrite circuit behavior 2 wks 10/27/11 11/9/11Test excitatory synapse connection in Multisim 1 day 10/31/11 10/31/11 1,2Test inhibitory synapse connection in Multisim 1 day 11/1/11 11/1/11 1,3Design LLBN axon hillock 1 day 11/10/11 11/10/11 1Design EBN axon hillock 1 day 11/10/11 11/10/11 1Design TN synapses 1 day 11/10/11 11/10/11 15,2Design LLBN synapses 1 day 11/11/11 11/11/11 3,5,2Design EBN synapses 1 day 11/11/11 11/11/11 3,10,2Design LLBN dendrites 1 day 11/14/11 11/14/11 6,4Design EBN dendrites 1 day 11/14/11 11/14/11 11,4Design TN dendrites 1 day 11/14/11 11/14/11 16,4Design LLBN axon timing circuit 1 day 11/15/11 11/15/11 7Design EBN axon timing circuit 1 day 11/15/11 11/15/11 12Design TN axon timing circuit 1 day 11/15/11 11/15/11 17Assemble LLBN in Multisim 1 day 11/16/11 11/16/11 5,6,7,8Assemble EBN in Multisim 1 day 11/16/11 11/16/11 10,11,12,13Assemble TN in Multisim 1 day 11/16/11 11/16/11 15,16,17,18Design OPN axon hillock 1 day 11/17/11 11/17/11 1Design IBN axon hillock 1 day 11/17/11 11/17/11 1Design AN axon hillock 1 day 11/17/11 11/17/11 1Design OPN synapses 1 day 11/18/11 11/18/11 20,3Design IBN synapses 1 day 11/18/11 11/18/11 25,3Design AN synapses 1 day 11/18/11 11/18/11 30,2Test neuron pair where both syanpses exist inMultisim2 days 11/2/11 11/3/11 1,2,3Design OPN dendrites 1 day 11/28/11 11/28/11 21,4