10.07.2015 Views

Full of Energy - Energie AG Oberösterreich

Full of Energy - Energie AG Oberösterreich

Full of Energy - Energie AG Oberösterreich

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ANNUAL REPORT2007/2008THE GROUPGROUP MAN<strong>AG</strong>EMENT REPORTTHE ENERGY SEGMENTTHE WASTE MAN<strong>AG</strong>EMENT SEGMENTTHE WATER SEGMENTCONSOLIDATED FINANCIAL STATEMENTS42ecological improvements. During the year under reviewthe largest project was the 15 MW biomass powerstation at Timelkam. In this context, the increased use<strong>of</strong> biogenic fuels and their impact on emissions andash quality was studied.Moreover, a project on the industrial production <strong>of</strong>algae biomass in artificial biospheres, using CO 2 di -rectly from emissions, as well as oxygen recoveredfrom photosynthesis, is to be started at Timelkam,together with a cooperation partner.EXPANDING PROPRIETARY TRADINGThe volatile price development on international marketshas shown that it is <strong>of</strong> major importance to havea dynamic orientation and direction concerningthese developments. <strong>Energie</strong> <strong>AG</strong> OberösterreichTrading GmbH (Trading GmbH), the central tradinghouse <strong>of</strong> the <strong>Energie</strong> <strong>AG</strong> Group, can therefore befound on the most important market places <strong>of</strong> theEuropean electricity market and is thus able to reactquickly to price developments. This includes electricitytrading at stock exchanges, in bilateral transactions,as well as via brokers, but also trading inenergy-related products, such as CO 2 -certificates orcertificates <strong>of</strong> origin. In this context, transactions concerningthe procurement <strong>of</strong> primary energy on internationalmarket places for coal, natural gas, and oilare <strong>of</strong> particular importance. In the case <strong>of</strong> marketliquidity, transactions on futures markets for longtermprice hedging are also possible and are utilizedin order to control risk, as well as to secure futureresults.MAJOR INVESTMENTS FOR THESECURITY OF SUPPLIES BY ENERGIE <strong>AG</strong>NETZ GMBH INTO NEW TRANSFORMERSTATIONS, CABLES, AND LINES.The central focus <strong>of</strong> trading activities is to managethe risks and to optimize the costs <strong>of</strong> the entire intragroupelectricity portfolio. This includes selling andmarketing own electricity, generated by our powerstations, as well as electricity procurement rights,and raising the electricity volumes needed for electricitydistribution. Another major field <strong>of</strong> activity <strong>of</strong>Trading GmbH is to hedge the risks in connectionwith energy transactions and energy production facilities.In addition to optimizing the internal electricity portfolio,proprietary trading is further expanded as part<strong>of</strong> a precisely defined and efficient risk management.Transparency, as well as efficiency <strong>of</strong> the trading sectoris secured by strictly separating the optimization<strong>of</strong> procurement and distribution from actual tradingactivities. An early warning system that also extendsdeeply into the various portfolios indicates directlythat defined risk limits have been reached. As aresult, the trading processes and decisions have aclear structure and can be reviewed at any time onaccount <strong>of</strong> a current reporting system.During the 2007/2008 business year proprietarytrad ing amounted to 4,671 GWh. It was thus possibleto increase the volume sold by almost 60% over theprevious year, which also decisively marked the growth<strong>of</strong> sales <strong>of</strong> the energy segment and the entire <strong>Energie</strong><strong>AG</strong> Group.INCENTIVE-BASED REGULATION ANDCOST MAN<strong>AG</strong>EMENT OF THEELECTRICITY DISTRIBUTION SYSTEMAs part <strong>of</strong> the currently valid incentive-based regulationsystem, the tariffs <strong>of</strong> <strong>Energie</strong> <strong>AG</strong> OberösterreichNetz GmbH (Netz GmbH) were again loweredby E-Control, the regulatory authority, by 1.8% as<strong>of</strong> 01 January 2008. For customers, the reductionamounted to only 1.1%, as the upstream transmissioncosts <strong>of</strong> VERBUND-Austrian Power Grid (APG) wentup at the same time. After the decrease by 2.7%, as<strong>of</strong> 01 January 2007, during the 2006/2007 businessyear, this was the lowest reduction in tariffs sinceincentive-based regulation began.While tariffs for system use were reduced, the procure -ment costs for extra-group supplies and services formaintenance and investments went up considerably.Once again non-scheduled costs to repair damage afterinterruptions due to adverse weather conditions alsowent up. It is only by consistently continuing the costreduction course taken, that it will be possible tosustainably ensure stable results for the distributionbusiness area.On 01 March 2008 the electricity grid <strong>of</strong> <strong>Energie</strong> <strong>AG</strong>was massively affected by the impact <strong>of</strong> hurricane"Emma". Thanks to the smoothly functioning emergencymanagement and the targeted deployment <strong>of</strong>assembly and technical teams, it was possible to limitthe consequences for the population. Although thedamage caused was less than that caused by hurricane"Kyrill" in January 2007, it once again reachedabove-average dimensions. On account <strong>of</strong> experiencewith natural disasters in previous years, Netz GmbHbegan to prepare a program already prior to hurricane"Emma" that will reduce the exposure <strong>of</strong> the grid tometeorological interferences. Additional efforts arebeing made to implement measures in this connection.Putting medium and low-voltage overland lines intothe ground is a particularly effective measure in areas<strong>of</strong> high damage exposure.While it was possible during the year under review torealize further cost reduction potentials, investmentsinto the security and quality <strong>of</strong> supplies were onceagain on a high level.During the expired business year, 84 km <strong>of</strong> mediumvoltagelines and cables, 315 km <strong>of</strong> low-voltage linesand cables, and 58 transformer and switching stationswere built.The electricity volume distributed to end customersrose again to 6,675 GWh, as compared to the yearbefore (6,529 GWh) which was marked by a mildwinter. Sales to key accounts show a rather constantcourse. The increase in sales is mainly due to highersales to private customers. However, these increasesdid not make it possible to fully compensate the dropin volumes <strong>of</strong> the previous year. From a multi-yearperspective, the volumes sold to private customers areapproximately in the range <strong>of</strong> the 2004/2005 businessyear.As a precaution for an eventual introduction <strong>of</strong> qualityregulation, customer satisfaction was reviewed duringthe expired business year.The quality <strong>of</strong> customer services was measured in eightclassical system-operator processes: disconnect ing theelectricity distribution, new link-up <strong>of</strong> a household tothe system, line insulation, statement by municipalities,thinning-out operations, assembly <strong>of</strong> buildingsiteelec tricity meters, new link-up <strong>of</strong> a business tothe system, and clearing <strong>of</strong> a construction site.The interviews revealed a gratifying result for NetzGmbH. On a scale ranging from 1 to 100, the satisfactionindex is at 95.23. For the individual processes,customer satisfaction amounted to values be -tween 99.15 and 90.4. In spite <strong>of</strong> the ex cellent surveyresult, Netz GmbH will analyze the identifiedpotential for improvements in more detail and takefurther steps to optimize customer-based services.In summary form, the survey shows the pr<strong>of</strong>essionalapproach <strong>of</strong> the Netz GmbH staff members and <strong>of</strong>the intra-group service providers at the customer interfaces.During the 2007/2008 business year, Netz GmbH drewup its own guidelines, involving as many staff membersas possible. In the summer <strong>of</strong> 2007, a comprehensivesurvey had already been conducted amongstaff members. At the beginning <strong>of</strong> the business yearunder review, the results <strong>of</strong> that survey were furtherdiscussed at informal "guideline round-tables". In thecourse <strong>of</strong> these discussions, three priority subjectsemerged for the drafting <strong>of</strong> the guidelines, in additionto the great commitment and expectations <strong>of</strong> staffmembers: the benefit <strong>of</strong> Netz GmbH for all stakeholders,safety at work, as well as internal and externalcommunication.In the summer <strong>of</strong> 2008, the core statements <strong>of</strong> the newcompany guidelines were presented to all staff members<strong>of</strong> Netz GmbH as principles for their actions.During the summer <strong>of</strong> 2008, the preparations for thetransition to the 2 nd regulatory period (2010 – 2013)entered into their intensive phase. VEÖ (Association<strong>of</strong> Austrian Power Plants) and E-Control exchanged43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!