10.07.2015 Views

OPERATING ANd INSTALLATION INSTRUCTIONS - Stiebel Eltron

OPERATING ANd INSTALLATION INSTRUCTIONS - Stiebel Eltron

OPERATING ANd INSTALLATION INSTRUCTIONS - Stiebel Eltron

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5. FAILURES – CAUSES – CORRECTIONENGLISHFailures Causes CorrectionInadequate water pressureShut-off valve is not completely open.Open Shut-off valve. Clean or exchange pipes.Cold or hot water line is obstructed.Hot water flow inadequateBoiler temperature is set too low.Recommended 176 to 185 °F / 80 to 85 °C.Heat exchanger is calcified.Set boiler to recommended temperature.Clean heat exchanger.Hot water storage tank not being heatedProgram selection at the heater control is notSelect and set program per instructions.properly selected.Outlet quantity inadequate Aerator at the extraction point blocked. Unscrew aerator and clean.Hot water supply exhausted too quicklyFlow rate too high. Recommended 2.6-3.9 gal./min.or 9.8-14.8 l/min.Restrict spigot valve rate.6. TECHNICAL SPECIFICATIONS1Components of the SBB S / SBB Plus1. Sacrifical anode indicator2. Glass lined steel tank3. Thermometer well4. Immersion sleeve for boiler temperature probe5. Spare port6. Immersion sleeve for solar temperature probe7. Inspection port8. Expanded polystyrene-thermal insulation9. Cold water inlet (SBB 300 & 400 S/Plus)10. Solar/main inlet11. Solar/main heat exchanger12. Solar/main return13. Heat exchanger from boiler feed (SBB 300, 400, 600 Plus)14. Upper heat exchanger (SBB 300, 400, 600 Plus)15. Heat exchanger to boiler return (SBB 300, 400, 600 Plus)16. Warm water outlet / T&P relief valve location17. Cold water inlet (SBB 600 Plus)18. Circulation portWWW.STIEBEL-ELTRON-USA.COM SBB S & SBB PLUS SOLAR STORAGE TANKS | 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!