10.07.2015 Views

R-MOSAIC

R-MOSAIC

R-MOSAIC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Application and Installation (continued):Use a grout float to gently beat the tiles to ensuretiles are seated into the mortar properly and thesurface of the mosaic sheet has a flat surface.Ensure grout joints are aligned then allow the mortarto harden for 20–60 minutes. Remove any excessmortar from joint areas and face of the tiles while themortar is still fresh.Once the mortar has hardened enough dampen theface sheets and remove the paper. Allow to cure24 hours before grouting.Clean Up: With water while fresh.Refer to www.robertsconsolidated.com, materialsafety data sheet, product data sheet and industry standards prior toinstallation for additional information.Limited Warranty: Buyer assumes all risk of use, handling and storageof product not in strict accordance with the label, printed literature andindustry standards. This limited warranty excludes all other expressor implied warranties including the warranties of merchantability orfitness for a particular use or purpose. Any implied warranties arisingby operation of law are limited to one year. Roberts will not be liablefor any incidental or consequential damages. Some provinces do notallow these limitations or exclusions, therefore they may not apply. Thiswarranty gives you specific legal rights and you may also have otherrights which vary from province to province.Available Sizes:SIZE PRODUCT # UPC25 lb. (11.3 kg) Bag 9419RB25 07537894192710 lb. (4.5 kg) Pail 9419RB10 075378941910WARNING: EXISTING FLOORING AND ADHESIVES MAY CONTAIN ASBESTOS. Unless you have confirmation that the existing flooringsystem is not asbestos containing, do not sand, dry sweep, dry scrape, abrade, drill, saw, bead blast, mechanically chip or pulverizeexisting flooring or adhesive without taking all appropriate precautions. Refer to local, state and federal guidelines for treatment andremoval of these products. You may also refer to the Resilient Floor Covering Institute’s “Recommended Work Practices for Removalof Resilient Floor Coverings.”EXISTING PAINT MAY CONTAIN LEAD. Unless you have confirmation that the existing paint is not lead containing, do not sand,dry sweep, dry scrape, abrade, drill, saw, bead blast, mechanically chip or pulverize existing paint without taking all appropriateprecautions. Refer to local, state and federal guidelines for treatment and removal of lead containing paint. You may also refer towww.epa.gov/lead.Roberts Company Canada Ltd. • Bramalea, Ontario L6T 1A7 • (800) 840-9422 • www.robertsconsolidated.com 2S0711_6564

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!