Appendix A â Work Breakdown Structure (WBS)
Appendix A â Work Breakdown Structure (WBS)
Appendix A â Work Breakdown Structure (WBS)
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong>TasksScoping Pre-Final Final Tasks SealedTasks TasksTasksD P F S800.1.7. - <strong>Structure</strong>s ReportD.800.1.7800.1.7.1 - Prepare and Submit Structural Analysis ReportD.800.1.7.1800.1.7.2 - MCDOT ReviewD.800.1.7.2800.1.7.3 - Prepare and Submit Pre-Final Structural Selection ReportD.800.1.7.3800.1.7.4 - MCDOT ReviewD.800.1.7.4800.1.7.5 - Prepare and Submit Sealed Structural Selection ReportD.800.1.7.5800.1.8. - Utilities Overview ReportD.800.1.8 P.800.1.8 F.800.1.8800.1.8.1 - Draft Utilities Overview ReportD.800.1.8.1800.1.8.1.1 - Prepare and Submit Draft Utilities Overview ReportD.800.1.8.1.1800.1.8.1.2 - MCDOT ReviewD.800.1.8.1.2800.1.8.2 - Draft Pre-Final Utilities Overview ReportD.800.1.8.2800.1.8.2.1 - Update and Submit Draft Pre-Final Utilities Overview ReportD.800.1.8.2.1800.1.8.2.2 - MCDOT ReviewD.800.1.8.2.2800.1.8.3 - Pre-Final Utilities Overview ReportD.800.1.8.3800.1.8.3.1 - Update and Submit Pre-Final Utilities Overview ReportD.800.1.8.3.1800.1.8.3.2 - MCDOT ReviewD.800.1.8.3.2800.1.8.3.3 - Update Pre-Final Utilities Overview ReportD.800.1.8.3.3800.1.8.4 - Final Utilities Overview ReportP.800.1.8.4 F.800.1.8.4800.1.8.4.1 - Update and Submit Final Utilities Overview ReportP.800.1.8.4.1800.1.8.4.2 - MCDOT ReviewP.800.1.8.4.2800.1.8.4.3 - Prepare and Submit Final Utilities Overview ReportF.800.1.8.4.3800.1.9. - Geotechnical and Pavement Design ReportD.800.1.9800.1.9.1 - Preliminary Geotechnical and Pavement Design ReportD.800.1.9.1800.1.9.1.1 - Prepare and Submit Preliminary Geotechnical ReportD.800.1.9.1.1800.1.9.1.2 - Prepare and Submit Preliminary Pavement Design ReportD.800.1.9.1.2800.1.9.1.3 - MCDOT ReviewD.800.1.9.1.3800.1.9.2 - Draft Pre-Final Geotechnical and Pavement Design ReportD.800.1.9.2800.1.9.2.1 - Update and Submit Draft Pre-Final Geotechnical ReportD.800.1.9.2.1800.1.9.2.2 - Update and Submit Draft Pre-Final Pavement Design ReportD.800.1.9.2.2800.1.9.2.3 - MCDOT ReviewD.800.1.9.2.3800.1.9.3 - Pre-Final Geotechnical and Pavement Design ReportD.800.1.9.3800.1.9.3.1 - Update and Submit Pre-Final Geotechnical ReportD.800.1.9.3.1800.1.9.3.2 - Update and Submit Pre-Final Pavement Design ReportD.800.1.9.3.2800.1.9.3.3 - MCDOT ReviewD.800.1.9.3.3800.1.9.4 - Prepare and Submit Sealed Geotechnical and Pavement Design ReportD.800.1.9.4800.1.10. - Alternatives AnalysisD.800.1.10800.1.10.1 - Prepare and Submit Draft Alternatives Analysis ReportD.800.1.10.1800.1.10.2 - MCDOT ReviewD.800.1.10.2800.1.10.3 - Prepare and Submit Sealed Alternatives Analysis ReportD.800.1.10.3800.1.11. - Features of the Recommended AlternativeD.800.1.11800.1.11.1 - Prepare and Submit Draft Features of the Recommended Alternative ReportD.800.1.11.1800.1.11.2 - MCDOT ReviewD.800.1.11.2800.1.11.3 - Prepare and Submit Sealed Features of the Recommended Alternative Report D.800.1.11.3800.1.12. - Public and Stakeholder InvolvementD.800.1.12800.1.12.1 - Prepare and Submit Draft Public and Stakeholder Involvement SummaryD.800.1.12.1800.1.12.2 - MCDOT ReviewD.800.1.12.2800.1.12.3 - Prepare and Submit Final Public and Stakeholder Involvement SummaryD.800.1.12.3800.1.13. - Right-of-Way RequirementsD.800.1.13800.1.13.1 - Prepare and Submit Draft Right-of-Way Requirements MemorandumD.800.1.13.1800.1.13.2 - MCDOT ReviewD.800.1.13.2800.1.13.3 - Prepare and Submit Final Right-of-Way Requirements MemorandumD.800.1.13.3800.1.14. - Cost EstimateD.800.1.14 P.800.1.14 F.800.1.14 S.800.1.14800.1.14.1 - Prepare and Submit Draft Cost Estimate MemorandumD.800.1.14.1800.1.14.2 - MCDOT ReviewD.800.1.14.2800.1.14.3 - Prepare and Submit Final Cost Estimate MemorandumD.800.1.14.3 P.800.1.14.3 F.800.1.14.3 S.800.1.14.3800.1.15. - Project Implementation and Master ScheduleD.800.1.15800.1.15.1 - Prepare and Submit Draft Project Implementation and Master Schedule Memorandum D.800.1.15.1800.1.15.2 - MCDOT ReviewD.800.1.15.2800.1.15.3 - Prepare and Submit Final Project Implementation and Master Schedule Memorandum D.800.1.15.3800.1.16. - FundingD.800.1.16800.1.16.1 - Prepare and Submit Draft Funding MemorandumD.800.1.16.1800.1.16.2 - MCDOT ReviewD.800.1.16.2800.1.16.3 - Prepare and Submit Final Funding MemorandumD.800.1.16.3800.1.17. - Design DocumentationD.800.1.17 P.800.1.17 F.800.1.17 S.800.1.17800.1.18. - Intelligent Transportation System (ITS) Infrastructure AssessmentD.800.1.18800.1.18.1 - Prepare and Submit Draft ITS Infrastructure Assessment ReportD.800.1.18.1800.1.18.2 - MCDOT ReviewD.800.1.18.2800.1.18.3 - Prepare and Submit Sealed ITS Infrastructure Assessment ReportD.800.1.18.3<strong>WBS</strong>Page 10 of 153/26/2013