Appendix A â Work Breakdown Structure (WBS)
Appendix A â Work Breakdown Structure (WBS)
Appendix A â Work Breakdown Structure (WBS)
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong>TasksScoping Pre-Final Final Tasks SealedTasks TasksTasksD P F S700Alternatives Analysis700.1. - Develop Conceptual AlternativesD.700.1700.1.1. - Provide Information for Draft Technical MemorandaD.700.1.1700.1.2. - Develop Conceptual AlternativesD.700.1.2700.1.3. - Approve Conceptual Alternatives - PMD.700.1.3700.1.4. - Provide Information for Fatal Flaw Analysis - Project TeamD.700.1.4700.1.5. - Fatal Flaw AnalysisD.700.1.5700.2. - Select Candidate AlternativesD.700.2700.2.1. - Review and Recommend Candidate Alternatives from Conceptual AlternativesD.700.2.1700.2.2. - Approve Candidate AlternativesD.700.2.2700.3. - Evaluation Criteria MatrixD.700.3700.3.1. - Develop Evaluation Criteria - Project TeamD.700.3.1700.3.2. - Submit Evaluation CriteriaD.700.3.2700.3.3. - Review Evaluation Criteria - Project TeamD.700.3.3700.3.4. - Approve Evaluation Criteria - PMD.700.3.4700.3.5. - Provide Input for Candidate Alternatives Plans - Project TeamD.700.3.5700.3.6. - Provide Input for Evaluation Criteria Matrix - Project TeamD.700.3.6700.4. - Evaluate Candidate AlternativesD.700.4700.4.1. - Develop Evaluation Criteria MatrixD.700.4.1700.4.1.1 - GeometryD.700.4.1.1700.4.1.2 - SafetyD.700.4.1.2700.4.1.3 - EarthworkD.700.4.1.3700.4.1.4 - Use of ExitingD.700.4.1.4700.4.1.5 - ConstructabilityD.700.4.1.5700.4.1.6 - Traffic OperationsD.700.4.1.6700.4.1.7 - Construction Traffic ControlD.700.4.1.7700.4.1.8 - Environmental impactsD.700.4.1.8700.4.1.9 - Cultural resourcesD.700.4.1.9700.4.1.10 - Archaeological impactsD.700.4.1.10700.4.1.11 - Socio-economic considerationsD.700.4.1.11700.4.1.12 - DrainageD.700.4.1.12700.4.1.13 - UtilitiesD.700.4.1.13700.4.1.14 - <strong>Structure</strong>sD.700.4.1.14700.4.1.15 - GeotechnicalD.700.4.1.15700.4.1.16 - Access ManagementD.700.4.1.16700.4.1.17 - Right-of-wayD.700.4.1.17700.4.1.18 - Compatibility with other improvementsD.700.4.1.18700.4.1.19 - Public AcceptanceD.700.4.1.19700.4.1.20 - Present and future land usesD.700.4.1.20700.4.1.21 - Recreational ValueD.700.4.1.21700.4.1.22 - CostD.700.4.1.22700.4.1.23 - Design ExceptionsD.700.4.1.23700.4.2. - Update Evaluation Criteria MatrixD.700.4.2700.5. - Select Recommended Alternative - Project TeamD.700.5700.6. - Approve Recommended Alternative - Management CommitteeD.700.6700.6.1. - Prepare for MeetingD.700.6.1700.6.2. - Attend MeetingD.700.6.2700.6.3. - Recommended Alternative Approval - Management CommitteeD.700.6.3700.6.4. - Meeting SummaryD.700.6.4<strong>WBS</strong>Page 8 of 153/26/2013