Appendix A â Work Breakdown Structure (WBS)
Appendix A â Work Breakdown Structure (WBS)
Appendix A â Work Breakdown Structure (WBS)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong>TasksScoping Pre-Final Final Tasks SealedTasks TasksTasksD P F S500Utilities and Railroad500.1. - Utility Data AcquisitionD.500.1500.1.1. - Determine Level of Utilities Data AcquisitionD.500.1.1500.1.2. - Request Prior RightsD.500.1.2500.1.2.1 - Request Prior Rights InformationD.500.1.2.1500.1.2.2 - Provide Prior Rights InformationD.500.1.2.2500.1.2.3 - Determine Relocation CostsD.500.1.2.3500.2. - Utility IdentificationD.500.2500.2.1. - Research and Identify Utility DataD.500.2.1500.2.2. - Create Utility Base FileD.500.2.2500.2.3. - Utility DesignationD.500.2.3500.2.3.1 - Create Designation Base FileD.500.2.3.1500.2.3.2 - Designate UtilitiesD.500.2.3.2500.2.3.3 - Review Utility Designation FilesD.500.2.3.3500.3. - Utility CoordinationD.500.3 P.500.3 F.500.3500.3.1. - Utility Coordination MeetingsD.500.3.1 P.500.3.1 F.500.3.1500.3.1.1 - AgendaD.500.3.1.1 P.500.3.1.1 F.500.3.1.1500.3.1.2 - AttendanceD.500.3.1.2 P.500.3.1.2 F.500.3.1.2500.3.1.3 - Meeting NotesD.500.3.1.3 P.500.3.1.3 F.500.3.1.3500.3.2. - Utility ConflictsD.500.3.2500.3.3. - Utility Test-holingD.500.3.3500.3.3.1 - Prepare Test Hole ListD.500.3.3.1500.3.3.2 - Perform Test HolesD.500.3.3.2500.3.3.3 - Update Utility Base File with Test Hole DataD.500.3.3.3500.3.4. - Utility Adjustments and RelocationsD.500.3.4 P.500.3.4 F.500.3.4500.3.4.1 - Provide Plans to Utility CompaniesD.500.3.4.1 P.500.3.4.1 F.500.3.4.1500.3.4.2 - Determine Utility Relocation Right-of-WayD.500.3.4.2 P.500.3.4.2500.3.4.3 - Utility RelocationD.500.3.4.3 P.500.3.4.3 F.500.3.4.3500.3.4.3.1 - NTP for Utility Design - MCDOTD.500.3.4.3.1 P.500.3.4.3.1500.3.4.3.2 - Utility Relocation Design - UtilitiesD.500.3.4.3.2 P.500.3.4.3.2500.3.4.3.3 - Review Design - Project TeamD.500.3.4.3.3 P.500.3.4.3.3500.3.4.3.4 - Update Utility Base FileD.500.3.4.3.4 P.500.3.4.3.4500.3.4.3.5 - Issue Relocation PermitD.500.3.4.3.5 P.500.3.4.3.5500.3.4.3.6 - Utility RelocationD.500.3.4.3.6 P.500.3.4.3.6 F.500.3.4.3.6500.3.5. - Utility AgreementsP.500.3.5500.3.5.1 - Provide Estimate - Utility CompanyP.500.3.5.1500.3.5.2 - Draft Agreement - MCDOTP.500.3.5.2500.3.5.3 - BOS Meeting Lag TimeP.500.3.5.3500.3.5.4 - MCDOT BOS ApprovalP.500.3.5.4500.3.6. - Establishing Utility Service ConnectionF.500.3.6500.4. - Utility PlansP.500.4500.4.1. - Utility Plan SheetsP.500.4.1500.4.2. - Utility Plans ReviewP.500.4.2500.5. - Utility Special ProvisionsP.500.5 F.500.5500.6. - Utility Clearance LetterF.500.6600Environmental600.1. - Environmental RequirementsD.600.1600.1.1. - Provide Input on Environmental ScopeD.600.1.1600.1.2. - Environmental Identification (EI) DocumentD.600.1.2600.1.2.1 - Prepare EI DocumentD.600.1.2.1600.1.2.2 - Submit EI DocumentD.600.1.2.2600.2. - Acquire Existing Environmental InformationD.600.2600.2.1. - Biological ResourcesD.600.2.1600.2.2. - Water Quality / Section 404 / 401 PermittingD.600.2.2600.2.3. - Traffic Noise AnalysisD.600.2.3600.2.4. - Air QualityD.600.2.4600.2.5. - Hazardous MaterialsD.600.2.5600.2.6. - Cultural ResourcesD.600.2.6600.2.7. - Land Use, Socioeconomic, and Visual QualityD.600.2.7600.3. - Environmental Constraints MapD.600.3<strong>WBS</strong>Page 4 of 153/26/2013