10.07.2015 Views

Download PDF - Buro Happold

Download PDF - Buro Happold

Download PDF - Buro Happold

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

This project involves the redevelopment of the land around the disused LULpower station at Lots Road in South West London. It includes a residentialledredevelopment of two sites split by a creek and located in two adjoiningboroughs (Hammersmith and Fulham/Chelsea and Westminster.) As well as there-development of the power station itself, there are nine other buildings includingtwo towers of 28 and 35 storeys respectively.The power station building will re-use the existing foundations to support thenew superstructure. A new double basement is being dug in through the existingfoundation structure to balance new loads with the existing.Disciplines involvedGround Engineering • Lighting • Rivers & Coastal • Structures • Transport • Waste

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!