10.07.2015 Views

Chemical Processing AC7108 Rev. E - Performance Review Institute

Chemical Processing AC7108 Rev. E - Performance Review Institute

Chemical Processing AC7108 Rev. E - Performance Review Institute

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Buy-Off - Checklist Changes• 5.19.1 Does the supplier utilize “first piece”/”lot” and “inprocess” inspection, as required, to verify the process?• 5.19.2 Do the lot inspection and lot test recordingrequirements require sufficient data to be recorded todemonstrate that the sample size and acceptance criteriawere fully met, and are traceable to the person(s) whoactually did the inspection/test?– Compliance Assessment Guidance: Recording of just an average maynot be acceptable to demonstrate each item measured met theacceptance requirement. In process checks, e.g. coating thickness, thatare done to aid processing do not require recording.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!