10.07.2015 Views

Download the Annual Report 2012-13. - kiocl limited

Download the Annual Report 2012-13. - kiocl limited

Download the Annual Report 2012-13. - kiocl limited

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

11. ENVIRONMENTAL MANAGEMENT11.1 Your Company has been accredited with ISO 14001-2004 Environment Management System.11.2 Your Company is committed to preserve <strong>the</strong> Ecologyand prevention of pollution in its mining/manufacturingactivities. In this direction, a number of environmentalinitiatives have been taken during <strong>the</strong> year yieldingpositive results. The highlights of this area are asunder : -(a) Constructed Shed No.4 for additional storage of1000 tons of Coke and Shed No. 5 for storingof Bentonite to prevent fugitive emissions duringhandling of Coke and control air pollution.(b) Asphalting of 450 meters internal road has beencompleted to prevent dust generation duringmovement of heavy vehicles.12. SAFETY12.1 Although <strong>the</strong> mining activities at Kudremukh havebeen stopped with effect from 01-01-2006 as per<strong>the</strong> Hon’ble Supreme Court’s verdict, regular safetyinspections are being carried out to ensure safety andoccupational health of employees engaged in upkeepand maintenance of Mining Equipments, essentialservices like water pumping, watch and ward etc.Safety awareness training is being imparted to <strong>the</strong> newcontract labourers who are coming for dismantling <strong>the</strong>structures and o<strong>the</strong>r related works at Kudremukh.12.2 Workers participation in Safety Management System isone of <strong>the</strong> important criteria adopted by <strong>the</strong> Company.Area wise Safety Committees are formed. Workersparticipation in <strong>the</strong>se Safety Committees is ensured. TheCommittee meetings are conducted at regular intervals.(c)(d)(e)(f)(g)Additional water sprinklers have been installedand continuously operated for suppression ofdust in <strong>the</strong> plant premises in addition to mobilewater sprinklers.Several wet scrubbers, bag filters and multicloneshave been installed and maintained tocontrol <strong>the</strong> dust emission effectively in <strong>the</strong> plant.Constructed 4 Nos. settling pits along withstorm drain facilities. This would facilitatesettling of suspended solids carried away by<strong>the</strong> storm water. The settled solids will be desiltedduring dry season or pumped back in to<strong>the</strong> process stream by submersible pumps. TheIron Ore fines carried by <strong>the</strong> storm water aretrapped in <strong>the</strong> settling pits and recovered fur<strong>the</strong>rfor processing.A pit with pumping arrangement has beenprovided in <strong>the</strong> Cooling Pond area forrecirculation of <strong>the</strong> spillages from Shed-1 andShed-2 area and to conserve water.Extensive de-silting operation has been taken upduring <strong>2012</strong>-13 and about 39,833 MT of materialhas been reclaimed from cooling pond and usedin production of Pellets. De-silting operation hasfacilitated to hold more water in cooling pond.This would reduce ultra fines reporting in <strong>the</strong>cooling pond overflow.12.3 Safety inspections are carried out regularly by <strong>the</strong>safety Officer along with Safety Committee members.Safety points are discussed in <strong>the</strong> Safety meetingsheld once in three months. Suitable action is taken forimplementation of <strong>the</strong> shortfalls if any for improvement.12.4 Various training programmes are being conducted toinculcate safety consciousness and to develop humanresources. Refresher training covering <strong>the</strong>ir area ofworking, First Aid Training, Fire Fighting, Awarenessprogramme on Quality, Environmental, Occupational,Health & Hazards, Vigilance Awareness, SustainableDevelopment, Lecture on Productivity week andcovered 2758 mandays of training for workmen, 1091mandays for Executives and 510 mandays trained forcontract workers. This excludes employees nominatedto various external Seminars, Workshops/Training.12.5 As <strong>the</strong> Mangalore unit is under <strong>the</strong> aegis of <strong>the</strong> FactoriesAct from January 2006, <strong>the</strong> National Safety Day &Safety week is celebrated from 4th to 10th Marchevery year. National Safety Flag hoisting, competitionon Safety poem, Safety slogan & Drawing competitionin Hindi, English & Kannada languages are conducted.<strong>13.</strong> QUALITY CONTROL - ISO 9001: 2008The Company’s Quality Management System iscertified under ISO 9001:2008 International Standard.This Certificate is valid upto 08-11-2015.37th <strong>Annual</strong> <strong>Report</strong> <strong>2012</strong> - 1327 KIOCL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!