10.07.2015 Views

Leakage Prevention Guidebook - Bureau of Waterworks Tokyo ...

Leakage Prevention Guidebook - Bureau of Waterworks Tokyo ...

Leakage Prevention Guidebook - Bureau of Waterworks Tokyo ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

exhaust valve <strong>of</strong> distribution maindistribution mainBlock water meterpassing waterroute plan 1Distribution pipeDistribution pipefor shutdownwater flowpassing waterroute plan 2estimated point <strong>of</strong>damageUnable to flow water on route1 and 2 due to damages.Ensuring that 通 水 there is nodamage on route 3, flow waterto passing water area 2.passing waterroute plan 3passing water area 1 passing water area 2Fig.10<strong>Leakage</strong> volume investigation and measurement work(2) Mobile workA work for repairing an aboveground leakage found by report <strong>of</strong> a customer, by patrol <strong>of</strong> staff or by other means iscalled mobile work. In the 23 wards, staffs at 6 branch (14 <strong>of</strong>fices) and repair subcontractors at each <strong>of</strong>fices stand-by on around-the-clock basis to attend to mobile works.Inside Tama area, <strong>Tokyo</strong> <strong>Waterworks</strong> Service Co., Ltd (administrative organization <strong>of</strong> the <strong>Bureau</strong> <strong>of</strong> <strong>Waterworks</strong>, <strong>Tokyo</strong>metropolitan government) and repair contractors are at call 24 hours a day so as to undertake mobile works in cities andtowns in which the <strong>Bureau</strong> <strong>of</strong> <strong>Waterworks</strong> has a direct control on operation. Inquiries in case <strong>of</strong> accidents are handled atthe Tama Customer Service Center.On the other hand, as per cities with their <strong>of</strong>fice administration being committed to the third parties, staff <strong>of</strong> each city andrepair contractors are ready for mobile works.2.1.3 Secure high level <strong>of</strong> leak prevention technologiesWith background that we need to “maintain low rate <strong>of</strong> water leakage” and “mass retirement <strong>of</strong> veteran workers”, weacknowledge and human resources development are our significant challenges.(1) Training and Technical Development CenterTraining and Technical Development Center launched in 2005 in response to a deterioration <strong>of</strong> an environment <strong>of</strong>leakage prevention work supervises research and development directly connected with succession <strong>of</strong> technology to the- 9 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!