10.07.2015 Views

Leakage Prevention Guidebook - Bureau of Waterworks Tokyo ...

Leakage Prevention Guidebook - Bureau of Waterworks Tokyo ...

Leakage Prevention Guidebook - Bureau of Waterworks Tokyo ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1 Outline <strong>of</strong> leakage prevention1.1 Present situationThe rivers flowing in this area, namely Tone, Ara,Tama and Sagami rivers are the main source <strong>of</strong> waterused in the <strong>Tokyo</strong> Metropolitan area.<strong>Leakage</strong> vol.42million m3 2.7%We collect raw water from these rivers, processpurification at water plants such as coagulation,sedimentation and filtration, convey into undergroundwater pipes with pressure, then supply as tap water tocustomers. In the process <strong>of</strong> supplying tap water, somewater leaks from the pipes into the ground. This is the“leakage <strong>of</strong> water”.Water leakage in FY2010 decreased to 42 million m 3 ,2.7% to total distribution <strong>of</strong> 1.569 billion m 3 , comparedfrom 6.4% <strong>of</strong> water leakage rate (107 million m 3 ) inFY 2001,which is ten years ago. (Fig.1, Table-1 and 2)Most <strong>of</strong> the leakage is caused by cracked or corrodedservice pipes and distribution pipes due to aging. Thetotal cases <strong>of</strong> leakage repair work in FY 2010 recordedaround 14,500, and 97% <strong>of</strong> which were at supply pipes,and the remaining 3% were at distribution pipes.(Table-3 and 4)Distribution vol.1,569 million m3Fig.1 Annual distribution volumeand leakage volume in FY2010Mobile work13,777 cases94.5%Planned work801 cases5.5%<strong>Leakage</strong> is classified into two types by its form;“surface leakage” flows out on the ground and“underground leakage” leaks out underground withoutappearing on the surface.Surface leakage is handled by mobile work andunderground leakage by planned work. The ratio <strong>of</strong>two types <strong>of</strong> work is shown in Fig. 2-1.Basically we conduct repair works <strong>of</strong> groundleakage within a day <strong>of</strong> occurrence. Total number <strong>of</strong>repair cases (mobile work) in FY2010 was 13,777. Onthe other hand, the underground leakage (planned work)forms about 70% <strong>of</strong> total leakage volume because theseare kept unnoticed for a long time without publicexposure. (Fig.2-2). Therefore, unless we identify andrepair leakages systematically, valuable water willcontinue to leak and large accidents may occur. Thenumber <strong>of</strong> repair cases (planned work) in FY 2010 was801.Fig.2-1 Comparison betweenMobile work and Planned workMobile workPlanned work3,387 m 3 /D3.971 m 3 /D46.0%54.0%There always is a danger <strong>of</strong> water leakage on waterpipes from corrosion, affected by heavy traffic loadings,various construction works, not to mention earthquakesand unequal ground subsidence/settlings.Although water leakages are repaired as soon as they are- 1 -Fig.2-2Breakdown <strong>of</strong> leakage repair works(<strong>Prevention</strong> Volume )

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!