- Page 1: SOUTHERN CALIFORNIA REGIONAL RAIL A
- Page 5 and 6: 2.1.7 COMPROMISE JOINTS AND COMPROM
- Page 7 and 8: 3.2.3 OPERATION OF RAIL GRINDERS ..
- Page 9 and 10: 6.3.2 RAIL SURFACE CONDITIONS......
- Page 11 and 12: SECTION 9 TRACK GEOMETRY ..........
- Page 13 and 14: 11.9 HIGH WATER MARKS .............
- Page 15 and 16: 17.4 EARTHQUAKE INSPECTION.........
- Page 17 and 18: SECTION 1GENERAL INSTRUCTIONS1.1 SA
- Page 19 and 20: 1.2.2 HEALTHJob-related health conc
- Page 21 and 22: 1.3.2 LOADING OF MATERIALS AND TOOL
- Page 23 and 24: 1.5.3 OPERATION OF GRINDERS AND ABR
- Page 25 and 26: K. Tighten all hose connection. Not
- Page 27: 1.8 UPDATING TIMETABLE AND RULEBOOK
- Page 31 and 32: eporting. However employees with ac
- Page 33 and 34: that continue to create ride-qualit
- Page 35 and 36: 2.1.4 RAIL LENGTHSbetween the ends
- Page 37 and 38: FIGURE 2-1 - RAIL WEAR LIMITSRAILWE
- Page 39 and 40: B. Do not drive anchors along the r
- Page 41 and 42: D. For the proper maintenance of CW
- Page 43 and 44: 2.2.2.2 RAIL GANG LEADER (“FOREMA
- Page 45 and 46: B. If surfacing work has been perfo
- Page 47 and 48: D. Preferred Rail Laying Temperatur
- Page 49 and 50: 2.2.5 MAINTAINING CWR TRACKA. It is
- Page 51 and 52: train and after the track has been
- Page 53 and 54: FIGURE 2-3 - SCRRA CWR STRESS ADJUS
- Page 55 and 56: FIGURE 2-4 - CWR JOINT INVENTORY LI
- Page 57 and 58: C. Field Weld: Once after completio
- Page 59 and 60: B. Removal and replacement of a sec
- Page 61 and 62: B. Welding: Manganese turnout frogs
- Page 63 and 64: onded insulated joints; this destro
- Page 65 and 66: simultaneously controlling the gage
- Page 67 and 68: 3.1.12 LOCATION AND PREPARATION FOR
- Page 69 and 70: 4. Handle molds and base bricks wit
- Page 71 and 72: 3.2.2 VISUAL INSPECTION FOR RAIL GR
- Page 73 and 74: SECTION 4TURNOUTS, DERAILS, AND RAI
- Page 75 and 76: E. Inspect and make adjustments to
- Page 77 and 78: FIGURE 4-1 - QUARTERLY TURNOUT AND
- Page 79 and 80:
4. Length of Stock Rail5. Engineeri
- Page 81 and 82:
2. Where past experience has shown
- Page 83 and 84:
B. A trial assembly of the crossing
- Page 85 and 86:
4.3.5 BOLTSA. Install new crossing
- Page 87 and 88:
SECTION 5SIGNAL FACILITIES AND INSU
- Page 89 and 90:
5.8.4 INSTALLATIONA. Rail Gap: When
- Page 91 and 92:
DATEMANAGER, TRACK AND STRUCTURES M
- Page 93 and 94:
C. A depressed head and/or widening
- Page 95 and 96:
SECTION 7CROSS TIES AND SWITCH TIES
- Page 97 and 98:
7.4.2 GANG LEADER (“FOREMAN’S
- Page 99 and 100:
estriction and restoring speeds to
- Page 101 and 102:
C. Ballast regulator plows shall be
- Page 103 and 104:
E. The following defects shall be c
- Page 105 and 106:
SECTION 8PREVENTION OF TRACK BUCKLI
- Page 107 and 108:
who will issue them to all trains t
- Page 109 and 110:
pattern is not adequate to prevent
- Page 111 and 112:
out approximately 4 inches of the h
- Page 113 and 114:
SECTION 9TRACK GEOMETRY9.1 SURFACE9
- Page 115 and 116:
G. Before the track that has been w
- Page 117 and 118:
B. Out-of-Face Surfacing:1. If the
- Page 119 and 120:
G. The speed of freight trains is e
- Page 121 and 122:
9.4 ALIGNMENTThe standard length of
- Page 123 and 124:
9.7 TRACK GEOMETRY CAR9.7.1 PLANNIN
- Page 125 and 126:
other contractor personnel as such
- Page 127 and 128:
annual bridge, culvert, and structu
- Page 129 and 130:
11.4 IMPORTANCE OF GOOD DRAINAGEAde
- Page 131 and 132:
12.2.1 APPLICATIONBallast specifica
- Page 133 and 134:
pieces of any class of rock slope p
- Page 135 and 136:
13.4 METHOD OF CONSTRUCTIONA. Const
- Page 137 and 138:
SECTION 14MAINTENANCE-OF-WAY CARS14
- Page 139 and 140:
14.5 FLAT CARS - HANDLING TRACK PAN
- Page 141 and 142:
SECTION 16VEGETATION, GRAFFITI, AND
- Page 143 and 144:
16.3 GRAFFITIA. Painting over graff
- Page 145 and 146:
SECTION 17EARTHQUAKE RESPONSE17.1 G
- Page 147 and 148:
When an earthquake is reported, the
- Page 149 and 150:
indications are presence that will
- Page 151 and 152:
shall confirm that none of these co
- Page 153 and 154:
E. A list of key inspection locatio
- Page 155 and 156:
B. Low Track 10: Track less than 10
- Page 157 and 158:
provide reports on actual wave deve
- Page 159 and 160:
4. SCRRA Sheriff and Claims, if app
- Page 161 and 162:
SOUTHERN CALIFORNIA REGIONAL RAIL A
- Page 163 and 164:
Continuous Welded Rail (CWR): Rail
- Page 165 and 166:
Joint - Insulated: A rail joint des
- Page 167 and 168:
Standard Gage: See Gage 4’-81/2
- Page 169 and 170:
Yard: A system of tracks within def
- Page 171 and 172:
CWR INSTALLATIONSURFACINGRAIL DEFEC
- Page 173 and 174:
SCRRA ENGINEERING INSTRUCTIONS 2 of
- Page 175 and 176:
SOUTHERN CALIFORNIA REGIONAL RAIL A
- Page 177 and 178:
APPENDIX E - E.S. 2302 - 03 - TABLE
- Page 179 and 180:
APPENDIX E - E.S. 2302 - 05 - TABLE
- Page 181 and 182:
APPENDIX E - E.S. 2302 - 07 - TABLE