FIGURE 2-2 - RECORD OF RAIL INSTALLATION TEMPERATURESDateMilePostSubdivision<strong>Track</strong>No.RailN /SStringNo. &LengthAirTemp.RailTemp.Weather /TimeSubmitted by: _____________________________Description: ________________________________________________________________________________________________________________________<strong>Instructions</strong>:Date:Rail – N / S:String No.:Air Temp:Rail Temp:Weather/Time:Description:Distribution:Date when rail is laid.North or South rail, as defined by timetable direction.Number the strings beginning with #1 <strong>and</strong> continuing insuccession with each string laid in the course of the day. Eachday the crew should start the numbering with #1. Indicatelength of each string.Air temperature in degrees Fahrenheit taken at the same timethe rail temperature is taken.Rail Temperature in degrees Fahrenheit taken at the same timethe rail is anchored.Weather conditions <strong>and</strong> time when the air temperature <strong>and</strong> railtemperature are taken.Notes about special items (i.e., weather, mile post locations,etc.).Deliver completed forms (FIGURE 2-2) to SCRRA Managerof <strong>Maintenance</strong> of Way for filing by milepost order for eachsubdivision.SCRRA ENGINEERING INSTRUCTIONS 48 of 160 Revision Issue: 2-12-09

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!