10.07.2015 Views

Download Bid Document - SFCI

Download Bid Document - SFCI

Download Bid Document - SFCI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sl.no.STATE FARMS CORPORATION OF INDIA(A Govt Of India Undertaking)CENTRAL STATE FARM; SURATGARH-335804 (Raj.)Name of Work =Construction of Godown (Size. 21.80x125.50 M C/C) two no. at CSF, Suratgarh Near N.H. 15G. SCHEDULERates are without cementRef. BSRPWD,2009Description Qty. Rate Amount1. B-2,1.8 Earth work in excavation in foundation trenches or drains including dressing ofsides and ramming of bottoms ,lift up to 1.5 Mtr. including taking out theexcavated soil and depositing and refilling of jhiri with watering and rammingand disposal surplus excavated soil as directed with in a lead of 50 mtr. In allkind of soil2. B-143.2.7 Providing and laying in position cement concrete including curing ,compactionetc. of specified grade excluding the cost of centering and shuttering ,all workup to plinth level. In 1:4:8 (1 cement :4 coarse sand :8 graded stoneaggregate 40 mm nominal size.)3. B-305.1.7 Brick masonry in foundation and plinth with bricks of class designation 75 incement mortar 1:6 (1 cement :6 coarse sand)4 B-16615.2.2 Providing and laying damp ,proof course with cement concrete grade M-150(1:2:4)mortar prepared with 1% solution of water proof compound including 2course of hot blown bitumen (2 Kg per Sqm)complete as per specification withglass strip 3mm thick at a distance of 1 interval 50 mm thick.5 B-91.39 Providing and injection Chlopyrifous Emulsifiable concentrate 20% with 1%concentrate for PRE-CONCTRUCTIONAL. Ant termite as per treatment as perIS 6313 part III as amended from time to time and creating a continuouschemical barrier under and around the column pits, wall trenches, basementexcavation, top surface of plinth filling, junction of wall and floor along theexternal perimeter of building expansion joints over the top surface ofconsolidated earth of which apron in to be laid surrounding of pipes andconduits etc. complete as per specifications ( Plinth floor area only shall bemeasured for payment.)Heptachlor E.C. 20 % with 10 % concentration.502.59Cum96.87Cum332.01Cum29.44Sqm1953.13Sqm103.00 51766.771490.00 144336.301620.00 537856.20113.40 3338.50358.00 699184.74

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!